1 / 11

Welcome City of Dallas

Welcome City of Dallas. A quick tour overview. City of Arlington Pad Sites Tuesday’s Tour Schedule KISD - Drilling Eden SW - Fracturing (Fracking) Duke - Production Compressor Station – Pipeline Personal Protective Equipment (PPE) . Pad Sites in . Operators in . Chesapeake Energy

dalia
Download Presentation

Welcome City of Dallas

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WelcomeCity of Dallas

  2. A quick tour overview • City of Arlington Pad Sites • Tuesday’s Tour Schedule • KISD - Drilling • Eden SW - Fracturing (Fracking) • Duke - Production • Compressor Station – Pipeline • Personal Protective Equipment (PPE)

  3. Pad Sites in Operators in • Chesapeake Energy • XTO Energy • Carrizo Oil and Gas • Vantage Energy • Legend Resources • Titan Operating • Quicksilver Resources • 64 Pad Sites • 367 Well heads • Applications pending

  4. Tuesday’s Tour Start: City Hall travel to KISD site Chesapeake – KISD Drilling Here we will be able to observe a drill rig in the process of Horizontal Drilling

  5. Tuesday’s Tour Travel to Eden SW site

  6. Tuesday’s Tour XTO – Eden SW Fracturing (Fracking) It also resides in close proximity to several residential areas. A highly visible pad site, Eden SW is located to the east of two major thoroughfares; Cooper and Matlock.

  7. Tuesday’s Tour XTO – Eden SW Fracturing (Fracking) Travel to the Duke site

  8. Tuesday’s Tour The Duke Site will allow us to observe a pad site in production; after the Drilling and Fracking have been completed this is all that remains. Duke Pad Site – Chesapeake Production

  9. Tuesday’s Tour The Duke site is located next door to our final destination; DFW Midstream’s compressor facility Compressor Station -DFW Midstream Pipeline Duke Pad Site – Chesapeake Production

  10. Personal Protective Equipment • Hard hats, eye and hearing protection will be provided to Task Force, City Council and Staff • Temperatures will be hot • Please wear comfortable clothing • Water will be provided • Closed toe shoes are required

  11. We look forward to seeing you

More Related