1 / 12

Results on Test Cryostats and

AGATA Detector Group Meeting, IKP Cologne March 16th, 2006. Results on Test Cryostats and. The AGATA Asym. Triple: Status of Cryostat Production. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006. Assembly of Cap A003 into Test Cryostat 10032. Cross Talk Test Results by

dalila
Download Presentation

Results on Test Cryostats and

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006 Results on Test Cryostatsand The AGATA Asym. Triple: Status of Cryostat Production

  2. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006 Assembly of Cap A003 into Test Cryostat 10032 Cross Talk Test Results by Nigel and/or Bart

  3. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006 Assembly of Cap A002 into Test Cryostat 10033 FWHM @ 1,3 MeV Only row E; Core 2,15 keV

  4. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006 History Meeting Cologne Oct. 20th, 2005: Discussions and Determining of Measurements of the End Cap e.g. Clearance Cryostat – Cryostat: 0,50 mm Incl. Tolerance of End Cap: 0.15 mm Wall Thickness of End Cap: 1.00 mm Distance End Cap – Capsule Wall: optimized Wall Thickness Capsule: 0,80 mm Clearance between Capsules: 0.50 mm Distance Capsule, internal: 0.40 mm Tolerance Capsule Dimensions: 0.10 mm

  5. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006 November and December 2005 Design of an End Cap Geometry on Basis of these Numbers Workshop IKP Cologne with Catia CAD Programm

  6. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006 CTT Design Phase From January 2006 To End of February 2006 Viewer

  7. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006 Some Details ...

  8. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006

  9. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006 HV Modules and Control • To be discussed: • final size of modules • assembly to cryostat • cabling • power supply • PT 100 read out • LN2 read out electronic

  10. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006 • Status of Fabrication • Cold preamp blocks ~ 60 pcs in production • Warm preamps available • Internal cabling in production • Feedthrough plates in production • Dewars as shown ordered • Cryostat hardware as shown • Prepared as good as possible to get ready in time

  11. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006 Time Schedule Design Approval Design Finish and Fabrication Fabrication of Independent Parts Final Assembly Capsule Assembly

  12. AGATA Detector Group Meeting, IKP Cologne March 16th, 2006 Topics of CTT‘s Concern: • approval of the asym. cryostat design asap • Final fixing of the HV control units and their power supply • Discussions about frame mounting and cable channels, cable guiding etc.

More Related