1 / 1

Non-Point Bacterial Loading Watershed Model: Copano Bay Carrie Gibson, CRWR

Decay Load passed = Load received e -kt. * . P. Q (m 3 /yr). EMC (cfu/m 3 ). P. Watershed Junction Copano Bay. Load (cfu/yr). Land to Streams Streams Streams to Bay. Component 3: Calculations for bacterial load per grid cell.

Download Presentation

Non-Point Bacterial Loading Watershed Model: Copano Bay Carrie Gibson, CRWR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Decay Loadpassed = Loadreceived e-kt * P Q (m3/yr) EMC (cfu/m3) P Watershed Junction Copano Bay Load (cfu/yr) Land to Streams Streams Streams to Bay Component 3: Calculations for bacterial load per grid cell Non-Point Bacterial Loading Watershed Model: Copano BayCarrie Gibson, CRWR Schematic Network Process Schematic Results QAgriculture = 0.008312 * exp ( 0.011415 * ) = P cfu/100mL QRangeland = 0.0053 * exp ( 0.010993 * ) = * 0.9 = QUrban = 0.24 * ) = = CSTR Model c = L / (Q + kV) c = concentration in bay (cfu/m3) L = Bacterial Loading entering bay (cfu/year) Qtot (mm/yr) Q (m3/yr) QWater = 0 Parameters cfu/year Note: Runoff, Q, and Precipitation, P, in mm/yr Bacterial Loading per Watershed (cfu/year), L Decay Coefficient, k (day-1) Volume of Copano Bay, V (m3) Cumulative Runoff, Q (m3/yr) Component 1: Calculations for Runoff per grid cell using Ann Quenzer’s runoff equations. Decay Coefficient, k (day-1) Travel Time, t (days) Decay Coefficient, k (day-1) Travel Time, t (days) Component 5: Calculating total accumulated bacterial loading to watershed (cfu/year) and converting to concentrations (cfu/100mL) using Schematic Processing tool Component 1 Component 4 (A) Component 5 Component 4 (B) Component 3 Component 2 Zonal Statistics Runoff per Watershed (m3/yr) Runoff Grid (m3/yr) Component 4 (A): Summation of runoff grid cells per watershed x 10,000 + = Input Load to SchemaNode (cfu/yr) Zonal Statistics Input EMC Grid (cfu/m3) EMC Grid (cfu/100mL) Land Use EMC Table Load Grid (cfu/yr) Load per Watershed (cfu/yr) Schematic Network Component 2: EMC Grid Calculations Component 4 (B): Summation of load grid cells per watershed - input into Schematic Network

More Related