1 / 19

CIP Standards Update

CIP Standards Update. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP-002-5 thru CIP-009-5 CIP-010-1 and CIP-011-1 Version 5 Filing FERC requested filing by 3/31/2013 NERC is continuing to work on strategies for filing

Download Presentation

CIP Standards Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CIP Standards Update

  2. 11/26/2012: NERC Board of Trustees adopted CIP v5 • CIP-002-5 thru CIP-009-5 • CIP-010-1 and CIP-011-1 Version 5 Filing • FERC requested filing by 3/31/2013 • NERC is continuing to work on strategies for filing • Filing intended to facilitate smooth transition through approval process Version 5 Update from NERC

  3. Entities required to be fully compliant with Version 4 on 4/1/2014 • Entities may need to make individualized risk based decisions depending on the time required to implement changes Transitioning all or in part to V4 early • Entities may modify their current Version 3 complaint RBAM at any point • Provide a risk-basis for any determinations • RBAM may be modified to arrive at the same result as the bright line analysis • Change must be based on a Version 3 compliant risk-based determination • Use first 50 pages of NERC petition for approval of Version 4 or the guidance document for Version 4 may be used Version 4 Status

  4. CIP-002 Comparison – Control Centers

  5. CIP-002 Comparison – Control Centers

  6. CIP-002 Comparison – Control Centers

  7. CIP-002 Comparison – Control Centers

  8. CIP-002 Comparison – Generation

  9. CIP-002 Comparison – Generation

  10. CIP-002 Comparison – Generation

  11. CIP-002 Comparison – Transmission

  12. CIP-002 Comparison – Transmission

  13. CIP-002 Comparison – Transmission

  14. CIP-002 Comparison – Transmission

  15. CIP-002 Comparison – Transmission

  16. CIP-002 Comparison – Other

  17. CIP-002 Comparison – Other

  18. NERC petition for approval of Version 4 • http://www.nerc.com/files/Final_Final_CIP_V4_Petition_20110210.pdf Guidance document for Version 4 • http://www.nerc.com/docs/standards/sar/Project_2008-06_CIP-002-4_Guidance_clean_20101220.pdf References

  19. Questions