1 / 1

Log Pond (rebuilt shoreline) Length = 1,500’

Sea Level Rise – Log Pond to Roeder. 29” Sea Level Rise Inundation Area 50” Sea Level Rise Inundation Area NOTES: 50 ” inundation area includes 29” inundation area. Sea level rise shown relative to MHHW which i s shown at 8.3’ elevation relative to NAVD88 Vertical datum.

daryl
Download Presentation

Log Pond (rebuilt shoreline) Length = 1,500’

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sea Level Rise – Log Pond to Roeder 29” Sea Level Rise Inundation Area 50” Sea Level Rise Inundation Area NOTES: 50” inundation area includes 29” inundation area. Sea level rise shown relative to MHHW which is shown at 8.3’ elevation relative to NAVD88 Vertical datum. Bathymetric/topographic base data from Anchor QEA Whatcom Waterway Cleanup Draft JARPA figures October 2012. Clarifier site (rebuilt shoreline) Length = 600’ 0-29” Sea Level Rise = 9’ max / 6.0’ avg encroachment. 0-50” Sea Level Rise = 15’ max / 10.3’ avg encroachment GP Dock (existing shoreline beneath dock) Length = 1,000’ 0-29” Sea Level Rise = 10’ max / 3.2’ avg encroachment. 0-50” Sea Level Rise = 19’ max / 5’ avg encroachment Log Pond (rebuilt shoreline) Length = 1,500’ 0-29” Sea Level Rise = 16’ max / 7.5’ avg encroachment. 0-50” Sea Level Rise = 30’ max / 12.6’ avg encroachment cjb Oct 2013

More Related