Status of Rod Production at UCSB

This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz Puneeth Kalavase Jim Lamb Claudio Campagnari. Status of Rod Production at UCSB. assembly. testing. Summary of rod production at UCSB.

davidtsmith
Download Presentation

Status of Rod Production at UCSB

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz Puneeth Kalavase Jim Lamb Claudio Campagnari Status of Rod Production at UCSB assembly testing

  2. Summary of rod production at UCSB • Stopped assembly Thursday May 5 because of concern with I2C errors • We have built 20 production rods • All 20 are tested on single rod stand • 12 have been tested on multi rod stand

  3. I2C errors • 6 out of 20 tested rods had I2C communication errors in position 6 • Similar behavior at FNAL • Reproduced at CERN • Not a feature of LtStruct software • I2C communication sensitive to details of line impedance, cabling, noise, even detailed sequence of commands (!) • Experts are investigating

  4. I2C errors (continued) • There has been a proposal to have CERN people come to US • Not universally favored at CERN • For now, continue remote investigation

  5. Long Term testing • Second batch of six rods went through longterm testing over the weekend • Last test cycle was interuppted by lack of fluid (slide 6) • First set consistent with ARCS testing except one pinhole • Second set consistent with ARCS testing • Disclaimer: didn't look at position six in detail because of i2c problems

  6. Long Term testing • Progress made in analyzing the data • Verified that DefectAnalyzer flags the right things given the cuts we set • Saturated pulse shapes in inverter-on modes cause problems for flagging, because we can't set cuts differently for inverter-on/-off modes • We can work around in DefectAnalyzer or fix it in LtStruct

  7. Long Term testing • Chiller lost all its fluid at the beginning of last week, after several days of running • We surmised the cause was the long pipes between chiller and freezer, so we made plans to move the chiller closer • We got new fluid on friday. • Chiller ran out again on Sunday morning • Interrupted the last cycle of tests • Leak found in an o-ring in valve between chiller and freezer • Still a good idea to move the chiller closer • The chiller is now moved

More Related