Group Meeting 01/29/2008. Sidong Zeng. Follow up with the network problems and installation in NBEL. (Done) Requested the NEC wireless network improvement. (Done) Updated the NBEL website. (Done) FTIR server machine installation. (Done) Analysis Genset test data. C programming.
E N D
Group Meeting01/29/2008 Sidong Zeng
Follow up with the network problems and installation in NBEL. (Done) • Requested the NEC wireless network improvement. (Done) • Updated the NBEL website. (Done) • FTIR server machine installation. (Done) • Analysis Genset test data. • C programming
Future Works • Analysis the Genset test data. • Labview • Follow up the lab Server