MicroSCADA Pro LEC-LEC co-operation Asan-Baebang Integrated SA/SCADA/DMS delivery. Jung-Wook Koh-KRABB/SAS Anssi Salonen-FIABB/SAS. Asan- Baebang integrated SA/SCDA/DMS. Introduction Backround data of the Client and project What is Community Energy Supply (CES) Project Brief
E N D
MicroSCADA ProLEC-LEC co-operationAsan-Baebang Integrated SA/SCADA/DMS delivery Jung-Wook Koh-KRABB/SAS Anssi Salonen-FIABB/SAS
Asan- Baebang integrated SA/SCDA/DMS • Introduction • Backround data of the Client and project • What is Community Energy Supply (CES) • Project Brief • Scope of the Supply of ABB • System Architecture • Main functions • System Architecture and solution for distribution network communication and automation • Split of the delivery and engineerig tasks between ABB • Key Challenges, Competition, & Cooperation • Summary
CES What is Community Energy Supply (CES)? KEPCO S/S CCPP Distribution Network G • A Energy Supplier builds a P/P & distribution network and supplies electricity & heat to restricted area such as residential area and/or commercial area. • KDHC, KNHC, Gas Suppliers, etc. • Power trade with KEPCO • Generator: 40 – 150MW • No. of Circuit Breaker on Distribution Network: 40 – 200 pcs • Around 36 projects are on-going.
Integrated System Project Brief • End Client: Korea National Housing Corporation (KNHC) • Customer: Kaenam Enterprises Ltd. • Area: 3,674,385 m2 • Population: 27,000 people / 8,700 household • Generation Capacity: 100MW • No. of Feeders and CBs: 12 Feeders / 105 CBs • The first DMS project supplied by a foreign supplier. • (KDN was a mono supplier for DMS in Korea.) • The first integrated system including ECMS (S/A) and DMS.
Integrated System Scope of Work (1) Product List
Integrated System Scope of Work (2) • System Engineering, Configuration, and Site Commissioning • Cubicles for 154KV Bus Protection, Tr. Protection, and SWYD control • Cubicle for LV, Diesel Generator, and DC/UPS • Loose relays supply for 22.9KV and 6.6KV SWGR • Cabling Fiber Optic Communication Cables • Communication Interface with FRTUs made in Korea
ECMS System Architecture of Asan-Baebang CES (1) Hot-Standby for ECMS & DAS DMS Field Equip. OWS1 OWS2 EWS COM for DAS GPS Event Printer Hard Copier F/O TCP / IP Network (100Mbps) Ethernet Switch F/O TCP / IP Network (IEC 61850) 100Mbps · · · · · · · · · · · · · · · 6LOT 3LOT 4LOT BUS Protection SWYD Control TR Protection TR Protection 13.8kV TR Protection & UPS 6.9kV 13.8kV,460V, D/G, UPS 154kV 22.9kV REC670 : 2EA RET541AM : 2EA REF541KM : 7EA REM543CG: 1EA REF541KM : 3EA REF541KB : 12EA REF543KB : 4EA REM543BM: 23EA REB670 : 1EA RET670 : 3EA REF541KM : 11EA Toshiba T/L Pro. 4EA RET670 : 3EA REF541KB : 28EA REF541KM : 3EA REF543KB : 9EA
DMS System Architecture of Asan-Baebang CES (2) Communication Front End To OWS 16 pcs serial lines ….. F/O DNP3.0 Network DMS Field Equipment (105 X FRTUs in CBs)
Location 13.8kV TR. Pro 2EA UPS 2EA 22.9kV TR. Pro 3EA C C C C C Location Diagram of Asan-Baebang CES Control B/D 3F GIS B/D 2F 154kV 15+4 22.9kV GIS & SWGR 40EA Ethernet Switch 16 lines 2F 1F 480V L/C 6EA Emer. D/G 2EA 6.9kV SWGR 42EA
DMS automatic falt location isolation • When fault occurs in network DMS analyses and locates the fault using fault detectors on FRTUs • In the next step DMS creates a sequence to isolate the faulted network and restore power not only to beginning of feeder but uses back-up connections to restore ends of the feeder • SYS 600 executes the sequence automatically monitoring success in each step (user has possibility to stop the sequence)
Integrated System Key Challenges, Competition, & Cooperation • Siemens, GE, and LSIS proposed two separate systems, S/A and Korean DMS • KDN, the sole vender for DMS system, proposed DMS. • FISUB and KRABB looked for the solution together and proposed. • One system for S/A and DMS. • Communication Interface with Korean FRTU’s. • Stress technically superior and operationally better solution. • Made the client change the specification • Work split between FISUB and KRABB • Plan to extend distribution feeders – additional 56 CB’s
Integrated System Summary • Customer’s need • Simplified System • Field Proven System based on IEC61850 • Korean FRTU should be applied • Easy Extension • ABB’s response • ABB can supply one system for S/A and DMS • No need to interface between S/A and DMS • Korean Standard FRTU can be interfaced • Extension is proven in KOGAS • Customer’s benefits • All information and operation with one system • Excellent local competence • Reduce the cost • Easy extension – plan to extend 56 CBs