CONSTRUCTIVO

¡Cumplimos!. BENEFICIOS. CONSTRUCTIVO. Se incrementará la velocidad de recorrido de 13 km./h a 60 km./h reduciendo los tiempos de traslado, de 1 hora a 15 minutos (entre Río Becerra y Eje 10 Sur). VELOCIDAD Y TIEMPO:. El concreto empleado equivale a la construcción de

Download Presentation

CONSTRUCTIVO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ¡Cumplimos! BENEFICIOS CONSTRUCTIVO Se incrementará la velocidad de recorrido de 13 km./h a 60 km./h reduciendo los tiempos de traslado, de 1 hora a 15 minutos (entre Río Becerra y Eje 10 Sur). VELOCIDAD Y TIEMPO:

  2. El concreto empleado equivale a la construcción de 25,000 viviendas aproximadamente. DIRECTOS INDIRECTOS EMPLEOS GENERADOS: ¡Cumplimos! GENERADORES CONSTRUCTIVO 3AÑOS8MESES (27 de Agosto de 2002 al 14 de Mayo de 2006) DURACIÓN DE LA OBRA

  3. 5,068 mdp ¡Cumplimos! NUMERALIA CONSTRUCTIVO COSTO DE LA OBRA: El dinero que se utilizó para ésta obra proviene principalmente de recursos fiscales obtenidos por ahorro y eficiencia en el gasto del Gobierno durante ésta administración.