110 likes | 291 Views
ALMA Planning 2014 cominf (archive) Alisdair Manning. 27/01/12. 1. What do we do all day?. 27/01/12. 2. JIRA View. 15. 21. 45. 5. 17. 6. 6. 14. 10. 27/01/12. 3. http:// ictjira.alma.cl /secure/ Dashboard.jspa?selectPageId =10104. 27/01/12. 4. Priorities.
E N D
ALMA Planning 2014cominf (archive)Alisdair Manning 27/01/12 1
What do we do all day? 27/01/12 2
JIRA View 15 21 45 5 17 6 6 14 10 27/01/12 3
http://ictjira.alma.cl/secure/Dashboard.jspa?selectPageId=10104http://ictjira.alma.cl/secure/Dashboard.jspa?selectPageId=10104 27/01/12 4
Priorities • ASA – close loop on deliveries with DataTracker • Pipeline Integration (including OODT into the RH) • Monitoring Database • ASA incremental updates • Harvester extensions • AQ features • RH features • performance • SourceCat schema restructuring • SourceCat cleanup / VO re-architecture • NGAS maintenance / performance / merge with ESO codebase 27/01/12 5
Priorities and Resources me Christophe CADC Heiko Schemas DataTracker ALMA schema Harvester SourceCat ASDM Updates NGAS Pipeline Int. RH - DtD RH - OODT Harvester DataPacker NGAS Download Manager AQ Monitoring 27/01/12 6
Relational ALMA • DelayHarvester and Sourcecat work (2015) • ASDM required for AQUA / ERMA • create insert / retrieve performance tests • Control’s schema in Garching dev env. • Cost / benefit. Suitable? Performant? Iterate. 16/03 • Review by DBAs • Modify module build order ARCHIVE / ICD 31/03 • Generate hibernate mappings from model 18/05 • Migrate online code, harvester, data packer 20/07 • APDM for ComInf tools (or use Oracle 11gr2 features?) • Feasible? Performance tests 30/09 • Hibernate mappings from model. 09/11 • Migrate DP, Harvester, online code. 31/12 27/01/12 7
Concretely Releases • 10.8 • Harvester corrections, galactic longitude / latitude, spatial resolution • DataTracker 1st release at ARCs • Detect ingestion of pipeline product from JAO • Does products PI belong to ARC? • Have all pieces made it to the ARC? • Email to PI • Another email one month before end of proprietary period • 2014.1 • Pipeline ingestion into Archive • 2014.2 • SourceCatalogue bugs, refactoring, data model changes, history • 2014.3 • DataPacker expansion to re-assemble pipeline products for delivery 27/01/12 8
Monitoring • https://ictwiki.alma.cl/twiki/bin/view/CommonInf/MonitorStore2014 • prototype delivery by end of June 2014 • operational system by end of Dec 2014
VO • AQ has been built around OpenCadc, which was lucky…. • AQ features being implemented by CADC • Requirements for TAP, ObsTap, SIAPv2, VoSpace, Cut-out (ICT-1246)