Kevin McShane Homework Problem 5-12 Develop a four month moving average forecast for Wallace Garden Supply And compute the MAD. Data found in Table 5.3 . Four Months. QM Calculated MAD along with other calculations. The formula is Sum of forecast errors / n . Measure Value

deanne
Download Presentation

Four Months

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kevin McShane Homework Problem 5-12 Develop a four month moving average forecast for Wallace Garden Supply And compute the MAD. Data found in Table 5.3 Four Months

  2. QM Calculated MAD along with other calculations. The formula is Sum of forecast errors/n Measure Value Error Measures Bias (Mean Error) 1.5125 MAD (Mean Absolute Deviation) 9.0625 MSE (Mean Squared Error) 86.1388 Standard Error (denom=n-2=6) 10.7169 Forecast next period 21.2

  3. Excel Developed a Graph