1 / 14

WSC Advisory Committee Agenda June 26, 2014 9:30  Welcome and general updates - Ben Ericson

WSC Advisory Committee Agenda June 26, 2014 9:30  Welcome and general updates - Ben Ericson 9:50   Soil Management - next steps for policy and potential regulations, plus updates - Paul Locke 10:20  MCP Implementation issues - Liz Callahan

Download Presentation

WSC Advisory Committee Agenda June 26, 2014 9:30  Welcome and general updates - Ben Ericson

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WSC Advisory Committee Agenda • June 26, 2014 • 9:30  Welcome and general updates - Ben Ericson • 9:50   Soil Management - next steps for policy and potential regulations, plus updates - Paul Locke • 10:20  MCP Implementation issues - Liz Callahan • Guidance development/plans for guidance development discussions • 72 hour notification for SRM conditions related to vapor intrusion • Other questions/issues? • 11:00   MCP "trailer package"  - issues to consider for additional MCP amendments  Liz Callahan & Paul Locke 11:30 Adjourn 

  2. 2014 MCP Implementation

  3. Guidance Development • Guidance discussion dates (LNAPL, VI, AUL) • Save the dates July 24, July 31 (AUL) • Comment review period for AUL, LNAPL and VI Guidance – August 22, 2014* * Based on the discussion at 6/26/14 WSCAC meeting, MassDEP will stagger the review period end dates for the AUL, LNAPL and VI draft guidance documents. Review periods will be set to close late Summer/early Fall. Exact dates TBD/announced.

  4. Information specific to the implementation of the 2014 MCP is located at http://www.mass.gov/eea/agencies/massdep/cleanup/regulations/site-cleanup-regulations-and-standards.html#6

  5. MCP-Related Fee Amendments – alsoeffective June 20, 2014 Notes: 1. One-Time Fees must be paid when submittal is made. 2. Regular Annual Fees are billed by MassDEP after Tier Classification; Fee Category is based on Status of site on Annual Status Date. 3. Completed Homeowner Certification Form BWSC120 is required to qualify for lower Homeowner fee rates. 4. One-Time Permanent Solution Fee also applies if site is Tier ID and submittal is made within first 90 days of initial Status Date. More information http://www.mass.gov/eea/agencies/massdep/cleanup/grants/waste-site-cleanup-fees.html

  6. MCP Errata Two types – • To be fixed as a technical correction - Publication errors • To be addressed in the MCP amendments “trailer package” - MassDEP drafting errors

  7. Table 1 MOHML RC Errors (technical corrections) CompoundCAS No. Aroclor 1016 12674-11-2 Aroclor 1221 11104-28-2 Aroclor 1232 11141-16-5 Aroclor 1242 53469-21-9 Aroclor 1248 12672-29-6 Aroclor 1254 11097-69-1 Aroclor 1260 11096-82-5 Aroclors 01336-36-3 Benzene, 1,1’-(Dichloroethylidene)Bis[4-chloro-… (DDE) 72-55-9 1,1’-Biphenyl, Chloro-Derivs. 1336-36-3 1,4-Diethylene Oxide (1,4-Dioxane) 00123-91-1 Methyl Mercury 22967-92-6 Naphthalene 91-20-3 Nickel 7440-02-0 PCB 1336-36-3 Polychlorinated Biphenyls, N.O.S. 1336-36-3 Polychlorinated Biphenyls (PCBs) 11097-69-1 Polychlorinated Biphenyls (PCBs) 11104-28-2 Polychlorinated Biphenyls (PCBs) 11141-16-5 Polychlorinated Biphenyls (PCBs) 12672-29-6 Polychlorinated Biphenyls (PCBs) 12674-11-2 Polychlorinated Biphenyls (PCBs) 53469-21-9

  8. Table 2 MOHML RC Errors (technical corrections) CompoundCAS No. Aroclor 1016 12674-11-2 Aroclor 1221 11104-28-2 Aroclor 1232 11141-16-5 Aroclor 1242 53469-21-9 Aroclor 1248 12672-29-6 Aroclor 1254 11097-69-1 Aroclor 1260 11096-82-5 Polychlorinated Biphenyls (PCBs) 11096-82-5 Polychlorinated Biphenyls (PCBs) 11097-69-1 Polychlorinated Biphenyls (PCBs) 11104-28-2 Polychlorinated Biphenyls (PCBs) 11141-16-5 Polychlorinated Biphenyls (PCBs) 12672-29-6 Polychlorinated Biphenyls (PCBs) 12674-11-2 Polychlorinated Biphenyls (PCBs) 53469-21-9

  9. 310 CMR 40.0570(3) and (5)(technical corrections) • Text still refers to Tier I Permits

  10. 310 CMR 40.0315(4)

  11. 72 Hour SRM Notification Triggers – Schools, Daycare or Child Care Centers, Occupied Residences (310 CMR 40.0313(4)(f)) l Soil Contamination Evidence of Vapor Migration Along Preferential Pathways Soil Gas Vadose Zone within 6 feet vertically from wall, 10 feet from foundation/basement floor at concentrations likely to discharge to structure Volatile LNAPL ≥ 1/8 inch within 30 feet of the structure in a monitoring well, excavation or subsurface depression VOC Groundwater Contamination >GW-2 within 30 feet of structure where average annual depth to groundwater ≤ 15 feet

  12. 310 CMR 40.0317(16) (16) releases indicated by the presence of oil and/or hazardous material in concentrations or quantities which would otherwise meet one or more of the sets of criteria set forth in 310 CMR 40.0313 through 310 CMR 40.0315 at a disposal site where: (a) a response action is being undertaken in compliance with the provisions of 310 CMR 40.0000 to address such release; (b) a release notification was previously provided to the Department for the disposal site on which the release has been observed or documented; and (c) such presence of oil and/or hazardous material is consistent with the types, nature, exposure potential and quantities of oil and/or hazardous material for which that notification was provided to the Department;

  13. MCP Trailer package – topics/timing

More Related