An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pacific Gas and Electric Company Automated Demand Response June 9, 2009 Connectivity Week, Santa Clara

  2. PG&E Auto-DR History • 2005 and 2006 – PG&E participated in the Auto-DR pilot with Critical Peak Pricing (CPP) • 2007 and 2008 – Offer C&I customer above 200kW Auto CPP and Demand Bidding (DBP) • 2008 – PG&E participated in the OpenADR Technical Advisor Group • 2009 – PG&E chairing the OpenADR in UCA Task Force under OpenSG Working Group

  3. Auto-DR applies to Emerging Technology • Lighting Control • Wireless (Adura, Universal Lighting Technologies, and EnOcean / Echoflex) • DR capability • Ease of installation • Reliability • Customer Acceptance • HVAC • Cypress Envirosystems Wireless Pneumatic Thermostat • Discharge Air Regulation Technique (DART) control system (TBD)

  4. Auto-DR Lighting Control ET Test

  5. Auto-DR/Emerging Technologies in progress • EMS for Small Business • Cost Effective • Chain • 50kW to 200kW • DR potential for Data Center • Virtualization Technology Strategies • Servers Consolidation • Storage consolidation • Power Delivery Systems Demand Response • Temporary Load Migration • Site Infrastructure Load DR • Raising Acceptable Temperature Set-Points • Switch to Free Cooling • CAV to VAV Conversion • Lighting Strategies

  6. PG&E DR Pilots • Participating Load Pilot • New CAISO MRTU • 3 C&I Auto DR customer • Telemetry • Drop load in 10 minutes • Bidding and scheduling • Connection between DRAS and ADS • Develop customer load reduction feedback • Intermittent Renewable Pilot • Industry Auto DR customers • Refrigerated Warehouse and Storage • Ramp up and down capability • Connection between renewable monitoring and DRAS

  7. Auto-DR Future • 06-08 Accomplishment • 110 Accounts • 30.3 MW • CPP and DBP • Customer type • 09-11 Program Plan • 45 MW • Capacity Bidding Program (CBP) and Peak Choice