1 / 34

Performance: Chap4-Burl Optimal Control

Performance: Chap4-Burl Optimal Control. Dr. Hatem Elaydi Islamic University of Gaza EE Department Spring 2012 Lecture 8. 4.1 General models of control systems. Example 4.1. 4.2 Transient performance analysis. 4.5 Cost functions & norms. Quadratic cost function. Example 4.3.

denim
Download Presentation

Performance: Chap4-Burl Optimal Control

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Performance: Chap4-BurlOptimal Control Dr. HatemElaydi Islamic University of Gaza EE Department Spring 2012 Lecture 8

  2. 4.1 General models of control systems Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  3. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  4. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  5. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  6. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  7. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  8. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  9. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  10. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  11. Example 4.1 Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  12. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  13. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  14. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  15. 4.2 Transient performance analysis Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  16. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  17. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  18. 4.5 Cost functions & norms Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  19. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  20. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  21. Quadratic cost function Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  22. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  23. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  24. Example 4.3 Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  25. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  26. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  27. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  28. The system 2-norm cost function Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  29. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  30. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  31. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  32. Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  33. Weighting functions for systems norms Dr. H. Elaydi, EE Dept, IUG, Spring 2012

  34. HW Dr. H. Elaydi, EE Dept, IUG, Spring 2012 4.2 4.4 4.7 Comp Exer. 4.1

More Related