STATE OF MONTANA HAZARD MITIGATION STRATEGY 2013 UPDATE

STATE OF MONTANA HAZARD MITIGATION STRATEGY 2013 UPDATE. Montana State Hazard Mitigation Coordinator: Kent Atwood 406-324-4782 Contractor: Tetra Tech, Inc. Daphne Digrindakis 406-443-5210. Flood Strategy. Goal 5 - Mitigate the Potential Loss of Life and Property from Flooding

dexter
Download Presentation

STATE OF MONTANA HAZARD MITIGATION STRATEGY 2013 UPDATE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STATE OF MONTANA HAZARD MITIGATION STRATEGY2013 UPDATE Montana State Hazard Mitigation Coordinator: Kent Atwood 406-324-4782 Contractor: Tetra Tech, Inc. Daphne Digrindakis 406-443-5210

  2. Flood Strategy • Goal 5 - Mitigate the Potential Loss of Life and Property from Flooding • 5.1 - Reduce the number of current and future structures in the floodplain. • 5.2 - Mitigate flooding of structures and infrastructure. • 5.3 - Increase public awareness of flood mitigation. • 5.4 - Improve the effectiveness of flood insurance programs.

  3. Project 5.1.1 Encourage jurisdictions to pursue mitigation projects for repetitive loss structures or any severe repetitive loss properties identified in the future. • Non-Planning Project • Score = 26 (Low) • State Priority = High • Schedule = On-going • Responsible Agency = Disaster & Emergency Services, DNRC-Water • Progress Made: Deer Lodge & Missoula Counties have HMGP acquisition projects through DR-1996 • Planned Activities: Acquisitions in Musselshell County and Harlem/Blaine County.

  4. Project 5.1.2 Develop and improve upon model floodplain ordinances for local and tribal governments. • Planning Project • Score = 18 (High) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Water • Progress Made: • Planned Activities:

  5. Project 5.1.3 Encourage appropriate entities to obtain conservation easements for land in floodplain • Planning Project • Score = 15 (Medium) • State Priority = High • Schedule = Mid-Range • Responsible Agency = MDT, MFWP, DNRC-Water, DES, Conservation Districts • Progress Made: • Planned Activities:

  6. Project 5.2.1 Encourage mitigation projects that upgrade undersized bridges that inhibit water flow or those with scour potential. • Non-Planning Project • Score = 32 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = Disaster & Emergency Services, Dept. Transportation, DNRC-Water • Progress Made: Kearny Lane Bridge/Madison Co. HMGP project through DR-1996 and Main Street Bridge/Deer Lodge PDMC Project (2010). • Planned Activities: Potentially some for DR-4074

  7. Project 5.2.2 Encourage communities at risk from ice jam flooding to apply for mitigation grants to install ice jam mitigation systems. • Non-Planning Project • Score = 36 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = Disaster & Emergency Services, Corps of Engineers • Progress Made: • Planned Activities: Trying to get Ennis and Twin Bridges to apply

  8. Project 5.3.1 Continue to provide flood insurance education. • Planning Project • Score = 13 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Water, National Weather Service • Progress Made: • Planned Activities:

  9. Project 5.3.2 Educate public on need to limit future development in the floodplain. • Planning Project • Score = 16 (High) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Water • Progress Made: • Planned Activities:

  10. Project 5.3.3 Educate home and business owners on utility tie-downs. • Planning Project • Score = 14 (Medium) • State Priority = Low • Schedule = Mid-Range • Responsible Agency = DES, DNRC-Water, Labor & Industry-Building Codes • Progress Made: • Planned Activities:

  11. Project 5.4.1 Provide outreach and technical assistance in joining the NFIP Community Rating System for reducing flood insurance premiums. • Planning Project • Score = 13 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Water • Progress Made: • Planned Activities:

  12. Project 5.4.2 Develop mapping for flood prone areas without maps. • Non-Planning Project • Score = 26 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Water • Progress Made: Need list of DFIRMS completed • Planned Activities: Need priority list for next round of DFIRMs

  13. Project 5.4.3 Update floodplain mapping from approximate to detailed maps. • Non-Planning Project • Score = 34 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Water • Progress Made: • Planned Activities:

  14. Project 5.4.4 Establish a schedule for National Flood Insurance Program maps review and updates.IS THIS REDUNDANT – DELETE? • Planning Project • Score = 12 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Water • Progress Made: • Planned Activities:

  15. Project 5.4.5 Encourage coordination between DES Coordinators, floodplain managers and land use planners. • Planning Project • Score = 12 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = Local Jurisdictions, Tribal Nations, DNRC-Water, DES • Progress Made: • Planned Activities:

  16. Dam Failure Strategy • Goal 3 - Reduce impacts from Dam Failure Hazard • 3.1 - Reduce the risk of dam failure

  17. Project 3.1.1 Obtain digitized inundation maps for federally-regulated high hazard dams for risk assessment. • Planning Project • Score = 19 (High) • State Priority = High • Schedule = Short Range • Responsible Agency = Disaster & Emergency Services • Progress Made: To extent practical, being done as part of 2013 State PDM Plan Update • Planned Activities: Coordinate with BuRec for inundation maps not released.

  18. Project 3.1.2 Repair state high hazard dams with deficiencies. • Non-Planning Project • Score = 42 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Water, MFWP, Dept. Corrections, Montana Heritage Commission • Progress Made: • Planned Activities:

  19. Project 3.1.3 Evaluate existing dams for hazard classification. • Non-Planning Project • Score = 40 (Medium) • State Priority = High • Schedule = Short Range • Responsible Agency = DNRC-Water, MFWP, Dept. Corrections, Montana Heritage Commission • Progress Made: • Planned Activities:

  20. Project 3.1.4 Keep Emergency Action Plans current. • Non-Planning Project • Score = 40 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Water, MFWP, Dept. Corrections, Montana Heritage Commission • Progress Made: • Planned Activities:

  21. Project 3.1.5 Exercise Emergency Action Plans every five years. • Non-Planning Project • Score = 34 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Water, MFWP, Dept. Corrections, Montana Heritage Commission • Progress Made: • Planned Activities:

  22. Project 3.1.6 Encourage continued participation of local and tribal DES in DNRC dam safety table top exercises. • Planning Project • Score = 16 (High) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Water, DES • Progress Made: Kerr Dam/Lake County, Flint Creek Dam/Granite County • Planned Activities:

  23. Earthquake Strategy • Goal 4- Reduce Potential Earthquake Losses in Seismically Prone Areas • 4.1 - Provide for earthquake resistance in new construction • 4.2 - Educate the public in earthquake mitigation and readiness. • 4.3 - Seismically retrofit existing critical facilities/infrastructure and government assets. • 4.4 - Implement non-structural mitigation projects to harden State and community assets and infrastructure from seismic hazards

  24. Project 4.1.1 Integrate seismic resilience into significant building retrofits. • Non-Planning Project • Score = 63 (High) • State Priority = High • Schedule = On-going • Responsible Agency = Dept. Administration • Progress Made: • Planned Activities:

  25. Project 4.1.2 Adopt seismic requirements of updated International Code Council. • Planning Project • Score = 18 (High) • State Priority = Medium • Schedule = On-going • Responsible Agency = Dept. Labor & Industry-Building Codes • Progress Made: • Planned Activities:

  26. Project 4.2.1 Continue “Earthquake Preparedness Month” outreach activities during the month of October. • Planning Project • Score = 11 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = Disaster & Emergency Services • Progress Made: • Planned Activities:

  27. Project 4.2.2 Continue presentations and distribution of earthquake awareness materials. • Planning Project • Score = 11 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = Disaster & Emergency Services?? • Progress Made: • Planned Activities:

  28. Project 4.2.3 Expand and upgrade the earthquake monitoring network and information reporting capabilities in high hazard areas. • Non-Planning Project • Score = 34 (Medium) • State Priority = Medium • Schedule = Mid-Range • Responsible Agency = Montana Bureau of Mines & Geology • Progress Made: • Planned Activities:

  29. Project 4.2.4 Quantify seismic hazards posed by faults. • Non-Planning Project • Score = 32 (Medium) • State Priority = Medium • Schedule = On-going • Responsible Agency = Montana Bureau of Mines and Geology • Progress Made: • Planned Activities:

  30. Project 4.3.1 Survey and install utility shut-off valves at all state buildings in the Intermountain Seismic Belt. • Non-Planning Project • Score = 60 (High) • State Priority = High • Schedule = On-going • Responsible Agency = All State Agencies • Progress Made: Projects at MLEA, Creative Arts Center/MSU-Bozeman. • Planned Activities: City of Helena Seismic, Mathews Hall/UM Western

  31. Project 4.3.2 At the Capitol Complex in Helena, seismically retrofit buildings with most vulnerability and highest occupancy to mitigate loss. • Non-Planning Project • Score = 48 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = Dept. Administration • Progress Made: Completed Tier 1 seismic evaluations of Capitol Complex buildings and identified structural and non-structural vulnerabilities. • Planned Activities:

  32. Project 4.3.3 At Montana University System campuses in the Intermountain Seismic Belt, seismically retrofit most vulnerable and highest occupancy buildings. • Non-Planning Project • Score = 45 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = Dept. Administration, University System • Progress Made: Completed Tier 1 seismic evaluations of University buildings and identified structural and non-structural vulnerabilities. Received PDMC grant to seismically retrofit Creative Arts Center at MSU-Bozeman. • Planned Activities: Have pending HMGP project through DR-1996 to seismically retrofit Mathews Hall at UM-Western.

  33. Project 4.3.4 At the Montana Dept. of Corrections facilities in Deer Lodge, improve support systems and implement seismic upgrades to ensure security and maintain operation. • Non-Planning Project • Score = 17 (Low) • State Priority = High • Schedule = Mid-Range • Responsible Agency = Dept. Administration, Dept. Corrections • Progress Made: Completed Tier 1 seismic evaluations of Dept. Correction buildings and identified structural and non-structural vulnerabilities. • Planned Activities:

  34. Project 4.3.5 At the Montana State Hospital in Warm Springs, seismically harden buildings and expand support systems to assure continued operation and meet medical needs. • Non-Planning Project • Score = 18 (Low) • State Priority = High • Schedule = Mid-Range • Responsible Agency = Dept. Administration • Progress Made: Completed Tier 1 seismic evaluations of MT State Hospital buildings and identified structural and non-structural vulnerabilities. • Planned Activities:

  35. Project 4.3.6 At the Montana Developmental Center and Riverside in Boulder, implement seismic upgrades. • Non-Planning Project • Score = 17 (Low) • State Priority = High • Schedule = Mid-Range • Responsible Agency = Dept. Administration, Dept. Corrections, Dept. Public Health & Human Services • Progress Made: Completed Tier 1 seismic evaluations of several MDC buildings and identified structural and non-structural vulnerabilities. • Planned Activities:

  36. Project 4.3.7 Conduct seismic evaluations of state-owned buildings in the intermountain seismic belt (including utility tunnels and infrastructure systems) to identify where seismic retrofits are necessary. • Non-Planning Project • Score = 38 (Medium) • State Priority = High • Schedule = Mid-Range • Responsible Agency = Dept. Administration • Progress Made: Completed Tier 1 seismic evaluations of 114 state-owned buildings at 15 campus/locations and identified structural and non-structural vulnerabilities. • Planned Activities:

  37. Project 4.3.8 Encourage local jurisdictions and tribal nations in the Intermountain Seismic Belt to conduct seismic evaluations of their critical facilities. • Non-Planning Project • Score = 63 (High) • State Priority = High • Schedule = On-going • Responsible Agency = Disaster & Emergency Services, Local Jurisdictions, Tribal Nations • Progress Made: Local PDM Plan updates have identified this as a mitigation project. Without funding, implementation uncertain. • Planned Activities:

  38. Project 4.3.9 Encourage and educate businesses in the Intermountain Seismic Belt to implement seismic retrofit projects. • Planning Project • Score = 17 (High) • State Priority = High • Schedule = On-going • Responsible Agency = Disaster & Emergency Services • Progress Made: • Planned Activities:

  39. Project 4.3.10 Encourage private utilities in Intermountain Seismic Belt to retrofit their systems for seismic stability. • Non-Planning Project • Score = 26 (Low) • State Priority = High • Schedule = On-going • Responsible Agency = Disaster & Emergency Services, Utilities • Progress Made: • Planned Activities:

  40. Project 4.4.1 Implement non-structural projects at state buildings in the Intermountain Seismic Belt. • Non-Planning Project • Score = 19 (Low) • State Priority = High • Schedule = Mid-Range • Responsible Agency = All State Agencies, University System • Progress Made: Completed Tier 1 seismic evaluations of 114 state-owned buildings at 15 campus/locations and identified non-structural deficiencies. Received PDMC grant to seismically retrofit (including non-structural elements) Creative Arts Center at MSU-Bozeman. Have pending HMGP projects through DR-1996 to seismically retrofit (including non-structural elements) Mathews Hall at UM-Western and Montana Law Enforcement Academy in Helena (non-structural only). • Planned Activities:

  41. Wildfire Strategy • Goal 9 - Reduce the Community Impacts of Wildland and Rangeland Fires • 9.1 - Reduce fuels in the WUI • 9.2 - Enhance community awareness of wildfires through education • 9.3 - Establish mapping or record keeping practices to support fuel management strategies

  42. Project 9.1.1 Conduct wildland fuel reduction on state property including parks, day-use facilities and highway rights-of-way. • Non-Planning Project • Score = 36 (Medium) • State Priority = Medium • Schedule = On-going • Responsible Agency = DNRC-Fire, MFWP, MDT • Progress Made: • Planned Activities:

  43. Project 9.1.2 Encourage fuel reduction in the WUI on local jurisdiction, tribal nation, and privately owned lands. • Non-Planning Project • Score = 40 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Fire, Disaster & Emergency Services, FireSafe Montana • Progress Made: • Planned Activities:

  44. Project 9.1.3 Encourage utilities and private landowners to conduct fuel reduction in right-of-ways. • Non-Planning Project • Score = 34 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = Utilities, DNRC-Fire, FireSafe Montana • Progress Made: • Planned Activities:

  45. Project 9.1.4 Participate in the coordination of mitigation projects of federal lands adjacent to state/private holdings. • Non-Planning Project • Score = 28 (Low) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Fire, USFS, BLM, DES, BuRec, FireSafe Montana, Tribal Nations • Progress Made: • Planned Activities:

  46. Project 9.1.5 Encourage biomass utilization from wildland fuel mitigation projects. • Planning Project • Score = 11 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Fire, DES, FireSafe Montana • Progress Made: • Planned Activities:

  47. Project 9.2.1 Promote public responsibility for defensible/survivable space in the WUI. • Planning Project • Score = 14 (Medium) • State Priority = On-going • Schedule = Responsible Agency = DNRC-Fire, FireSafe Montana, Keep Montana Green, Governor’s Office Community Services • Progress Made: • Planned Activities:

  48. Project 9.2.2 Educate landowners in fuel reduction. • Planning Project • Score = 12 (Medium) • State Priority = High • Schedule = On-going • Responsible Agency = DNRC-Fire, FireSafe Montana, Keep Montana Green • Progress Made: • Planned Activities:

  49. Project 9.2.3 Continue to support and fund the statewide FireSafe Montana organization that gathers, disseminates and assists counties and other political subdivisions with grant information, project development and operations. • Planning Project • Score = 14 (Medium) • State Priority = Medium • Schedule = On-going • Responsible Agency = DES, USFS, BLM, DNRC-Fire • Progress Made: • Planned Activities:

  50. Project 9.2.4 Market fuel mitigation as a proper response to wildland fuel hazards.IS THIS REDUNDANT – DELETE? • Planning Project • Score = 17 (High) • State Priority = High • Schedule = On-going • Responsible Agency = DES, FireSafe Montana, DNRC-Fire • Progress Made: • Planned Activities: