An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transmission Workstream – 6th May 2010National Grid EU Transparency Project Update Chris Shanley

  2. Contents • Background • Key Project Updates • Data • Storage • New data items • Functionality • Timeline going forward

  3. Background • European Transparency Project (ETP) set up to manage National Grid’s compliance with recent implementation of EU 3rd Package • Key requirement is for data consistency & transparency across TSOs • Requires additional data to be published (both increased volume & frequency) • Project will build on recently implemented MIPI platform and provides opportunity to update some system functionality

  4. Data • Data Storage • All data items will be available on-line on a 5 year rolling basis • New data items – data will be collated from 1st October 2010 onwards and therefore 5 full years of data will be available from 30 September 2015 • Existing data items – history will increase from go-live and will gradually populate from 2 years to 5 years (2013). • Data Items • Final scope still to be finalised but will adhere to EU legislation • 3rd Party Sources (LNG & Storage Providers) have been engaged to assist with additional data provision • Data Dictionary will be updated to reflect new data items to be incorporated

  5. Functionality • Graphic Package • As part ETP, National Grid will be upgrading the current graphic package • Potential graphical improvements: - Multiple axes on the one graph - Rolling graphs - Stacked area graphs - When graphs and charts are printed, there should be no “ghosting”. • See appendix 1 for graph illustrations • Note 1: The existing graphs held in MIPI will be redesigned • Note 2: No changes to customer set up required.

  6. Further Updates • Available on current MIPI system via National Grid website • http://www.nationalgrid.com/uk/Gas/Data/ • Also available via ENSO-G data transparency platform • Link to follow in next update • Gas Ops Forum • Workshops - TBC?

  7. 3/3/2011 Design Development Testing Governance Implementation 3/3/2011 May Jun Jul Aug Sep Oct Nov Timeline Governance Activity                                                        Date • Data Dictionary updated to reflect the MIPI changes 1 Sept         • Submit updated Reporting Manual to UNCC                2 Sept • UK Link Committee 9 Sept • UNCC Meeting                                                             16 Sept • Users Notified                                                               15 Oct • MIPI ETP go-live 15 Nov EU 3rd Package Implementation Deadline

  8. Appendix 1 – ETP Example graph (1) Example of Proposed Forecast Graph Data for illustration purposes only (to show how graph could look)

  9. ETP Example graph (2) Current Two graphs, one to show p/KWh and one to show p/therm Proposed One graph to show p/KWh and p/therm on different axis. Data for illustration purposes only (to show how graph could look)