70 likes | 191 Views
All Experimenters’ Meeting. April 06, 2014. Photo by Greg Vogel. Accelerator Operation Summary. From : March 31 , 2014 (0000 hours) To: April 07, 2014 (0000 hours). Calendar Week # 14 NuMI Weekly Integrated Intensity 6 .73 E18 protons
E N D
All Experimenters’ Meeting April 06, 2014 Photo by Greg Vogel
Accelerator Operation Summary From : March 31, 2014 (0000 hours) To: April 07, 2014 (0000 hours) Calendar Week # 14 NuMI Weekly Integrated Intensity 6.73 E18 protons Beam Hours To NuMI149.6 hours BNB Weekly Integrated Intensity 4.38 E18 protons Beam Hours To BNB 149.3hours NMuon Weekly Integrated Intensity 1.01 E16protons Beam Hours To NMuon146.9 hours MTest Weekly Integrated Intensity 1.15 E14 protons Beam Hours To MTest58.5hours
MI Down-ramp 1.33 sec $2A $2A Picture of multiple RR/MI injections during the MI ramp. This plot shows a down-ramp on the $23 followed by two consecutive $2A ramps. Noted: the NuMI target toroid is not triggering on the second $2A cycle. there were only two $2A cycles in the TLG
Schedules and Links: • Schedule can be accessed from the Operations Home Page • - Schedules -> Operations Schedule • Direct link to schedule • - http://www-ad.fnal.gov/ops/schedule.html