Project Status

Project Status. Work Completed. IR communication(Protocol, software, and hardware) RF communication(Software and Hardware) Hardware(PCBs) Pack Tagger Pylon Central Computer Script interpreter. Work Completed (cont.). High level scripting language Parser/compiler/linker

dinos
Download Presentation

Project Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Status

  2. Work Completed • IR communication(Protocol, software, and hardware) • RF communication(Software and Hardware) • Hardware(PCBs) • Pack • Tagger • Pylon • Central Computer • Script interpreter

  3. Work Completed (cont.) • High level scripting language • Parser/compiler/linker • Remote procedural call • LCD interface • Communication between PC and devices • Ability to flash compiled script

  4. Work Remaining • System integration • IR and timer code • Power circuit • Program Gametypes • Gui for admin and scripting front end

  5. Problems Encountered • BDM Programmer • PCB Problems • Vdd and Vss • Foot prints • Power Circuit • Via sizes

  6. Test and Evaluation

  7. Difficulty Testing • System testing • Incomplete hardware • Module testing • Pack, Tagger… • Component testing • ICs and passives

  8. Demo Milestone • Protoboard Demo • Tagger • Pack • Central Computer

  9. Compiler Testing • Test Bench

  10. Time and Cost

  11. Magnitude • Project was huge • 12 hours per week to start • 25 hours per day at the end

  12. Past Costs

  13. New Costs

  14. Cost to Others • Scopes • Power Supplies • Countless parts checked out • Resisters • Caps • Programmer • Soldering Iron • Breakout Boards

  15. Safety and Ethical Considerations

  16. Safety and Ethics • IR safety • RF safety • Low power • System failure means little • Patent research from 364