1 / 7

Project Status

Project Status. MicroBooNE OPMO April 14, 2009. Skimpy Status this week - -. MicroBooNE collaboration meeting is later this week There is still some ongoing discussion on the CD-4 definition, on the project org chart, and related things

ace
Download Presentation

Project Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Status MicroBooNE OPMO April 14, 2009

  2. Skimpy Status this week - - • MicroBooNE collaboration meeting is later this week • There is still some ongoing discussion on the CD-4 definition, on the project org chart, and related things • Will be able to report conclusion on some items at the next OPMO meeting MicroBooE OPMO

  3. CD–0 Status • Draft document still with Randy • Holds information to use as input to Mission Need • White Paper – in progress by Cat • General description of the Project • Text to accompany “about MicroBooNE” slides • Will also hold the basic information which can serve as the input to a Mission Need • Can CD-0 arrive when readiness for CD-1 is demonstrated? • After a Director’s CD-1 readiness review, for example MicroBooE OPMO

  4. CD-4 Definition • Collaboration is close to agreement • Drafted by Bruce • Detector Facility complete and operational • All safety systems operational • Detector installation complete • All detector sub-system checkouts complete (criteria TBD) • Cryogenic plant tests with liquid argon complete • Ready for initial filling of vessel • Does not include • Demonstration of purge filling or purity • Observation of tracks MicroBooE OPMO

  5. Other Project Docs • In preparation for the collaboration meeting, I have created drafts of – • PMP section on Org structure, org chart + text • Key Assumptions • Contingency Rules • Risk Management Plan • Working on – • BOE form and instructions • Labor categories and rates MicroBooE OPMO

  6. Progress on WBS & Dictionary • Work continues • Same structure at Level 2 as previously shown • Working on more consistency at Level 3 across all the Level 2’s • Dictionary definitions drafted for Level 2 • Work continues filling in Level 3 definitions MicroBooE OPMO

  7. WBS Structure MicroBooE OPMO

More Related