1 / 47

FOCUS FOCUS FOCUS

FOCUS FOCUS FOCUS. FROM PAST TO PRESENT A BC SHIPBUILDER’S PERSPECTIVE. Presented By. Malcolm McLaren. President Allied Shipbuilders Ltd . November 2009.

dior
Download Presentation

FOCUS FOCUS FOCUS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FOCUS FOCUS FOCUS

  2. FROM PAST TO PRESENTA BC SHIPBUILDER’S PERSPECTIVE Presented By Malcolm McLaren PresidentAllied Shipbuilders Ltd.November 2009

  3. God & Shipbuilder We AdoreIn Times of Danger, Not BeforeWhen War Is Over, All Things RightedGod Is Forgotten, The Shipbuilder Slighted ...with apologies to Kipling

  4. Launch of 10,000 Ton Victory (Liberty) Ship West Coast Shipbuilders, Vancouver – Future Site of 2010 Winter Olympics

  5. Fort Chilcotin in English Bay - June 1942 The first WWII ship built by West Coast Shipbuilders (Hull #101) was launched March 7, 1942 and was a casualty of war having been sunk on July 24, 1943

  6. Rayonier No. 1 fully loaded

  7. Rayonier No. 1 leaps as it dumps its load

  8. Allied Shipbuilders Site – 1969 North Shore of Vancouver Harbour

  9. Launching the rail car barge Haida Transporter - April 27, 1968

  10. The 75-foot drum seiner Katrena Leslie (Hull # 214) underway in fog in English Bay

  11. Ships for Offshore OilThe West Coast & Arctic - Past- Is there a future for Canadians?

  12. The drill rig Sedco 135F was built by Victoria Machinery Depot

  13. The Lady Alexandra at sea - 1974

  14. OFFSHORE OIL & GAS Do governments have a role in making sure these opportunities are available to Canadians?

  15. Canada's Revolutionary Icebreakers Lead the World1975 - 1985

  16. 1970 to1980 – Arctic Oil Exploration Good for Shipbuilding & Ship Repair Major Damage to - Hull - Rudders & Stocks - Propellers

  17. Arctic Nutsukpok in the Beaufort Sea, bound for TukALLIED HULL 235

  18. The Kigoriak was the first icebreaker to operate year-round in the North American arctic

  19. Ships Few & Far Between(1990 - 2009)

  20. 470 Car Ferry Construction In Steel - 1993 Simple / Effective

  21. Chuck Ko Allied’s technical manager and Ed Stephenson Allied’s steel superintendent in front of the Spirit of British Columbia (Hull # 254) just before launch

  22. Bow view of the Spirit of Vancouver Island

  23. Chip Barges Built in BC – Post 2000Current Demand For Wood Chip Transport ?

  24. The Inkster on sea trials, with the crew on deck

  25. Allied Hull 259 – Delivered 2007

  26. Slow TimesMetal Shipbuilding Yard Closures1990’s - Burrard Drydock (Versatile, North Vancouver) - Yarrows (Versatile, Victoria) - Bel-Aire Shipyard, North Vancouver - Westcoast Manly, Vancouver - Vito Steel Boat, Delta - Matsumoto, North Vancouver - Shore Boats, Richmond

  27. 1986 – 1800 Ton Lift Capacity Floating Dry-dock 1990’s – B.C.’s Future was in Ship Repair Work for Some Most Shipbuilding Yards Close

  28. West Coast Shipbuilding Yards That Have Built Complex Vessels Over 30 Meters Long: - Allied Shipbuilders- Vancouver Shipyards (WMG)- Victoria Shipyards (WMG)

  29. THE COST OF CANADIAN BUILT SHIPS - BUILDERS MUST COMPLY WITH STRINGENT SAFETY & ENVIRONMENTAL STANDARDS, ETC. - CANADIAN MARINE REGULATORY CLIMATE AMONG MOST CHALLENGING IN THE WORLD - TO MY KNOWLEDGE, NOT DUE TO EXCESSIVE PROFITS FOR THE BUILDER

  30. ‘WHAT’ IS TO BE BUILT - TO BUILD REASONABLY PRICED SHIPS, THE CUSTOMER MUST COME TO THE PARTY - TOO OFTEN GOVERNMENT SHIPS ARE NEEDLESSLY COMPLEX - BUILD SIMPLE―UTILITARIAN―EFFICIENT - ACT AS IF IT IS YOUR OWN MONEY

  31. High Speed Ferry Owners Idea – Builders Receive the “Credit”

  32. Why Build In Canada?

  33. 100 Car Commuter Ferry Spartan, Utilitarian, Efficient

  34. 100 Car Commuter FerryAllied Hull 257

  35. BC Shipbuilding - Price Distribution Example - 360 foot / 100 vehicle ferry

  36. Global Shipbuilding Practise For many governments, shipbuilding is an important aspect of their national pride and industrial policy. Consequently, the industry worldwide operates in a distorted marketplace.

  37. Challenges For Canadian Shipbuilders European Union - Had direct subsidy until recently - Supportive Government Policy United States - Canadian built commercial vessels prohibited from USA, but US builds enjoy duty free access to Canada. Korea - Previous bailout by government / IMF - Supportive Government Policy China - Very low wage rates and supportive government policy Brazil – Supportive Government Policy

  38. ONLY REASONABLE THAT CANADIANS ARE INVOLVED WITH THE DEVELOPMENT AND PRODUCTION OF THEIR NATURAL RESOURCES. MUST HAVE NATIONAL POLICIES WHICH CREATE A COMPETITIVE DOMESTIC MARKET TO USEFULLY EMPLOY CANADIANS.

  39. GOVERNMENT LEGISTATION ACTION Ensure Canadian Industry Engaged In Building Ships For Resource Development. - The Rest Of The World Does

  40. Current CanadianFederal Government Policy “The federal government will continue to procure, repair and refit vessels in Canada subject to operational requirements and the continued existence of a competitive domestic marketplace”

  41. GOVERNMENT PROCUREMENT ACTION - COMPETITIVE BID PROCESS FOR PROCUREMENT - PRIVATE SECTOR SHIPYARDS RATHER THAN GOVERNMENT SHIPYARDS - UTILIZE THE EXISTING “SURVIVOR” SHIPYARDS; THEY HAVE PASSED THE TEST - IMMEDIATELY COMMENCE PRACTICAL SHIPBUILDING PROJECTS - BUILD NEW GOVERNMENT SHIPS ON A RATIONAL SCHEDULE TO ENSURE CONTINUITY OF WORK

  42. Questions

More Related