1 / 10

A N DY Status Commissioning with colliding beams

Status update on the commissioning of ANDY with colliding beams, including progress from 29 February to 5 March, IP2 access, and requests for upcoming demonstrations and measurements.

djulio
Download Presentation

A N DY Status Commissioning with colliding beams

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ANDY StatusCommissioning with colliding beams L.C.Bland, for AnDY 6 March 2012 Time Meeting, BNL

  2. Progress29 February to 5 March • IP2 access on 29 February fixed most missing signals, restored LED operation for rebuilt run-11 ECal modules and sealed ECal. • ECal modules are now on rails (thanks C. Folz!) and are presently positioned to provide HCal an unobstructed view of collisions • Subsequent separated-beams test runs show that BBC and HCal are ready for collisions

  3. Requests • Complete IP2 DX training as required for s=510 GeV head-on collisions on 14 March access, as scheduled • Setup IP2 b* for s=510 GeV as needed for 10 pb-1/week demonstration • We ask that you reconsider s=200 GeV collisions at IP2 to deliver 1 pb-1 as needed for jet analyzing power measurement

  4. Backup

  5. GEANT model of proposed ANDY apparatus (run-13) Changes to ANDY for Run-12 Thanks to C.Folz, et al. • Proposed ANDY detector (left), as submitted, consists of annular ECal, annular HCal, preshower + tracking through the (modified) PHOBOS split-dipole • The HCal module pair used in run 11 was modified to become an annular 12-row x 20 column HCal for run 12. The picture to the right shows the phototube (PMT) end of HCal upon completion of its installation in December, before installing all PMT. • Separated-beams test on 20120225 and 20120227 shows most things are working, and identifies some things to fix (a few holes) on the 20120229 access.

  6. With run-12 test, becomes “measured to be” Critical Run-12 Tests…proposed... • (1) Finish HCal calibration with new annulus: correction for hadronic response • (2) Test operation of GEM prototype • (3) Demonstrate 10 pb-1/week at s=500 GeV, as required for runs 13,14 ANDY • Comments: • Corrections to run-11 HCal calibration for hadron showers expected to be ~20% • GEMs improve position resolution from ~5cm (run-11)  ~0.1mm for calorimeter/preshower association required for background discrimination and other trackings • Data from run-12 IP2 tests will improve run-11 J/ , enable B J/ +K and start on concurrent s=500 GeV ANp0 measurement required to determine sign of DY AN

  7. Dileptons from Run 11 Data • ANDY profiling methods were applied to a limited data sample (Lint=0.5 / pb) of run-11 ECal triggered data. • Dominant backgrounds are now from g, and are suppressed by using MIP response of beam-beam counters to tag clusters. • Individual detector p0ggcalibration for HCal was an essential step to reconstruct J/ • Limited granularity of BBC and poor position resolution of HCal-EM cluster results in less photon suppression than expected for final ANDY apparatus (project ~100x better suppression) • Hadron suppression is not yet required, but will be in going from dileptons to DY • J/e+e- peak has ~120 events with 5.4s statistical significance. PYTHIA 6.425 with NRQCD expects 420 events in the run-11 acceptance, approximately consistent with observation after crude efficiency correction. From PYTHIA 6.425, DY with M>4 GeV/c2 is 170x smaller in this acceptance. • J/ is a window to heavy flavor via BJ/ K and LbJ/ p p- that would help quantify intrinsic b from proton backgrounds to DY Run-11 data absolutely compared to fast-simulator used for DY estimates

  8. Recall from run-11…Jets arXiv:1103.1591 jet AN measurements are required to clarify signs of quark/gluon correlators related to Sivers functions. s=200 GeV from p+pp “new” Sivers function “old” Sivers function • As noted last year, jets and photons can discriminate betweeen quark-gluon correlators • s=500 GeV jets from run-11 ANDY will have 2.5x larger pT at the same xF, relative to these predictions. • The best way to test things is at s=200 GeV Non-zero jet analyzing power essentially a prerequisite before proceeding to Drell Yan 12/19/2019

  9. ProposalBest test of theory with jets… • We propose testing impact of IP2 collisions during ongoing s=200 GeV operation • If impact is small as expected from last year, then proceed to integrate 1 pb-1 of luminosity. • The data sample can likely be obtained with *=7.5m at IP2, although this is inefficient • We propose, contingent on impact test, a 6-bunch test ramp with IP2 *3m

  10. Schematic of detector for Run-11Polarized proton collisions at s=500 GeV from February to April 2011 • Beam-beam counter (BBC) for minimum-bias trigger and luminosity measurement from PHOBOS [NIM A474 (2001) 38] • Zero-degree calorimeter and shower maximum detector for luminosity measurement and local polarimetry (ZDC/ZDC-SMD, not shown) • Hadron calorimeter modules (HCal) are 9x12 modules from AGS-E864 (NIM406,227) • Small (~120 cells) ECal loaned from BigCal at JLab • Pre-shower detector