RPC project status 4st RPC General Meeting 28 June 2011 Pigi Paolucci
RPC General Meeting (CMS week) GM organization: • Introduction (Pigi) • TC session (Salvatore) • RC session (Nicolas) • DPG session (Davide) • Upgrade session (Pino) • To give an overview to the collaboration • To focus our attention on “critical issues” • To underline priorities and manpower requests • To present interesting results • 2-3 specific talks will be proposed by coordinators. 4th RPC General Meeting - Pigi Paolucci
RPC organization chart 2011-2012 Conference Committee S. Park, B. Pavlov Editorial board S. Qian, M. Abbrescia S. Bianco Institution Board L. Litov Steering committee W. Van Doninck, M. Maggi H. Hoorani, A. Colaleo, A. Sharma (PM+DPM+RC+TC+DPG) Project Manager P. Paolucci M. Tytgat & G. Pugliese Resource manager A. Colaleo DPG D. Piccolo K. Bunkowski C. Carillo Tech. Coordination S. Buontempo A. Dimitrov Run Coordinator L. Benussi H. Shahzad N. Zaganidis Upgrade G. Iaselli Sharma S. Buontempo 4th RPC General Meeting - Pigi Paolucci
Main goals – 2011-2012 In priority order • High efficiency of the RPC data taking TC/RC • Assure an high quality of the data DPG/RC • Clear set of results (performance and studies) DPG • Build the RE4 upgrade system TC/Up • Enlarge the collaboration MB/IB • Manpower balance & budget consolidation MB/IB • but this is not enough for us and we have to do more and more to improve our project….(see next slide) 4th RPC General Meeting - Pigi Paolucci
More goals…… • Main performance results: • HV scan results (approved by CMS) • Background (approved by CMS) • System stability monitor (on-going) • Study and underline all the aspects in which the RPC could play a central role in CMS: • RPC use in present MuonReco (HyunkwanSeo) • Alternative reconstruction algorithms (Min Suk Kim) • Trigger studies (Warsaw and Filip) 4th RPC General Meeting - Pigi Paolucci
8 mbar 11 mbar 4th RPC General Meeting - Pigi Paolucci
Wheel/Disk <current> .vs. Time 4th RPC General Meeting - Pigi Paolucci
Beam halo Mu 3 Trigger Trigger rate .vs. Lumi (fitted) WBM tool RPC Background and current study should provides Similar Results Mu 25 Mu 10 4th RPC General Meeting - Pigi Paolucci
Current Beam intensity 4th RPC General Meeting - Pigi Paolucci
Not corrected with pressure Background position ? 4th RPC General Meeting - Pigi Paolucci
News to underline • Detector is running smoothly • P5 and CAF crews are working very well • Instruction have been improved a lot – Anna Cimmino, experts and shifters • Shift reports at RC/DPG meeting OK • HV P correction – ready to be tested at TS (central DCS team) • # of DQM plots to be reduced in few weeks (Task forces with Anna, Anna, Alaa & Cesare) • 2011 results: many approved in June • Background studies: 2010 and 2011 comparison • PVT: noise and DQM stored in database – ready to be used (WBM too) • Simulation: improved with 2010 efficiency table • Construction DB: improvements thanks to Anton and Daniela • Upgrade: • HLP production has been defined • Gap production MoU is almost ready 4th RPC General Meeting - Pigi Paolucci
What we have to improve • Communication between TC-RC-DPG • Participating to the main meetings • Use the hyper-news more and more • Following the official path for any new request • Communication between MB and 80 colleagues • People should participate to the meeting (only 10-15 to the RPC RC/DPG meeting) • Improve the communication between present project and upgrade • Results in a public web page • Put all the approved and not approved results in a common web page • Improve DQM performance (reducing memory usage) 4th RPC General Meeting - Pigi Paolucci
News about RPC organization • RPC MB, coordinators and experts have access to a shared google documents used to prepare the weekly report to the XEB meeting: • Very good way to share info ! • June 14th:TC:Everything was perfectly stable before the gas kill on 31th May. Then after a power-cut in SG5 and a gas kill we had 5 trips in the barrel and 1 in the endcap.All have been recovered. One chamber temporarily in SG mode till next access.Trigger: Muon Trigger rate variations observed (~9%) in last weeks, the most probable reason is variation of the RPC chamber efficiency (by 2-3%) with the pressure variation (impacting the trigger efficiency in the endcaps by 3-4%, and thus the rate). Still not clear is the variation of the cluster size could impact the probability of promoting the low pt muons to high pt (impacting the rate on given threshold). Variation is not present with low PT cut (Mu0 and Mu7) and increase from Mu16 to Mu20RC: stable since the HV scan - no problem with the new set of WP and efficiency very stable in time (2-3% of variation due to the pressure) • P/T correction in PVSS has been discussed and defined and will be tested during the next TSDPG:DQM: experts are investigating in the offline DQM to speed-up it. Right now we are using 4MB and we already deleted 4.000 histograms. Work is on going. • MC: Comparison of number of RPC hits in MuonReco of 2011 data with summer2011 MC, show nice agreement in barrel and endcap. Some small discrepancy in overlap region under studyUpgrade: MB: 4th RPC General Meeting - Pigi Paolucci
News about RPC organization • Shared google calendar with meetings and vacation (Pigi and Gabriella) • please ask to be included in the list • Minutes provided by all the coordinators – thanks a lot • XEB and XEC minutes circulates in real time • MB and FB minutes and news in a week • All info sent to Group Leader (we ask to circulate) 4th RPC General Meeting - Pigi Paolucci
Action Items • HV setting with P/T correction – approved by CMS but in a human version • Improve history plots monitoring (current, noise, efficiency) using WBM and database • Include DQM trigger check in CAF duties • Spare components procurement • Long 2012shut-down plan • Bakelite and gap production • Link and Control board prototype tests at 904 (Oct-Dec) 4th RPC General Meeting - Pigi Paolucci
2011 Agenda • General Meeting: Thursday at 9:30 (1 per month) • DPG/RC: Thursday at 9:30 (3 per month) • Tech coordination: Monday at 9:00 (weekly) • Upgrade: Tuesday at 9:00 (weekly) • Management: Wed at 10:00 (weekly) restricted • ISR meeting: Monday 14:00 (weekly) technical • 904 meeting: Wed 10:00 (weekly) technical • GEM meeting: Tuesday 14:00 (weekly) technical • Upgrade RE4 Workshop to be decided • Upgrade High Eta Workshop to be decided Let me ask the 4 coordinators and deputies to actively participate to the 3 weekly meetings. Unique project 4th RPC General Meeting - Pigi Paolucci
Conclusions • RPC system is running smoothly • Many many nice 2011 results approved by CSM • WBM is now used at CAF (noise to be included) • PVT ready to use DQM and noise data • Bakelite production ready to start • Gap production MoU ready in few weeks 4th RPC General Meeting - Pigi Paolucci