An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPC project status 1st RPC General Meeting 29 March 2011 Pigi Paolucci

  2. RPC General Meeting • RPC General Meeting will be held once per month, CMS week included. In total we have 12 GM per year • GM is for a large audience (not too technical talks) GM organization: • Introduction about the Project • Coordinator reports (TC-RC-DPG-Upgrade): • To give an overview to the collaboration • To focus our attention on “critical issues” • To underline priorities and manpower requests • To present interesting results • 2-3 specific talks will be proposed by coordinators. 1th RPC General Meeting - Pigi Paolucci

  3. RPC project – new organization • Organization Chart has been defined and it will be endorsed today at IB. • Thanks to all the people involved in the discussion and to who will be part of the chart. • Management Board and IB will support all the people involved in the organization as much as they can. 1th RPC General Meeting - Pigi Paolucci

  4. RPC organization chart 2011-2012 Conference Committee S. Park, B. Pavlov Editorial board S. Qian, M. Abbrescia S. Bianco Institution Board L. Litov Steering committee W. Van Doninck, M. Maggi H. Hoorani, A. Colaleo, A. Sharma (PM+DPM+RC+TC+DPG) Project Manager P. Paolucci M. Tytgat & G. Pugliese Resource manager P. Paolucci ad interim DPG D. Piccolo K. Bunkowski C. Carillo Tech. Coordination S. Buontempo A. Dimitrov Run Coordinator L. Benussi H. Shahzad N. Zaganidis Upgrade G. Iaselli Sharma S. Buontempo 1th RPC General Meeting - Pigi Paolucci

  5. DPG D. Piccolo K. Bunkowsk C. Carillo Run Coordinator L. Benussi H. Shahzad N. Zaganidis Detector & trigger analysis C. Carillo Phys Valid Tool S. Costantini Offline D. Piccolo Online K. Bunkowski Local Reco C. Carrillo DQM A. Cimmino ConfigurationK. Bunkowski Detector perfomance C. Calabria SoftwareValidation/ Data Certification J. Gho Run Quality Tae Jeong Detector DB Detector impact on trigger Resp. Simulation B. Pavlov Noise tools S. Costantini Trigger DB M Szlepper Calibration Streams M. Maggi DataBase M. Maggi WBM U. Berzano DCS Non event data P. Petkov Skims S. Tupputi DPG-POG Min Suk Kim Upgrade Resp. Covered RPC organization chart Manpower needed Not covered

  6. Conference and papers • RPC Editorial Board is now in charge for all the notes, conference notes/papers and papers • Only the approved papers will be considered RPC papers • Author list will be provided by the RPC Institution board to the editorial board. • RPC member can decide to sign or not every single paper. • RPC Conference Committee is in charge for the talk/poster proposal and to choose the nominated speakers. • RPC abstract sent directly to the conference will be “cancelled” by the CC. 1th RPC General Meeting - Pigi Paolucci

  7. Organization chart • I’m glad to have many phd student and post-doc in the LV3 organization chart. • Most of them are in the DPG and are participating to the data analysis of the RPC and Trigger performances • Bari, Ghent, Korea,Sofia, Uniandes……. • Let me underline the perfect integration of the 6 Korean Phdand post-doc. 3 of them are already in the DPG chart. 1th RPC General Meeting - Pigi Paolucci

  8. Main goals – 2011-2012 • Main scientific goals are: In priority order • High efficiency of the RPC data taking TC/RC • Assure an high quality of the data DPG/RC • Clear set of results (performance and studies) DPG • Build the RE4 upgrade system TC/Up • Enlarge the collaboration MB/IB • Manpower balance & budget consolidation MB/IB • but this is not enough for us and we have to do more and more to improve our project….(see next slide) 1th RPC General Meeting - Pigi Paolucci

  9. More goals…… • Study and underline all the aspects in which the RPC could play a central role in CMS: • Alternative reconstruction algorithms • Peculiar Trigger regions • How recover DT/CSC temporary inefficiency using RPC • More goals - we really need to work on: • New institutions and more young physicists • Help young people in maturating in the proper way • Move toward a “muon system” and “muon services” • Use the central CMS structures/group as much as we can 1th RPC General Meeting - Pigi Paolucci

  10. Possible strategies • New institutions can be attracted by the 2nd step of the upgrade (2017-2018) at high eta region. They should join RPC project previously to learn about CMS and the muon system. • How can we help young people in maturating: • Visibility and responsibilities • Work on different aspects of the project and not onlyone (detector, DAQ, trigger and data analysis) • Collaborate more and more with the CMS central projects • Conferences and papers • Work in group and not alone – be part of some task force 1th RPC General Meeting - Pigi Paolucci

  11. 2011-2012 data taking • It’s now time to work, we have 2 long years of data taking • Shifters and experts have a delicate role and we have to support them as much as we can: • Improve our tools and instructions • Organize training period for everybody • Support them during the “crucial” period • Operation Manager and Data Manager shifts are now counted as central shift. • Training period is mandatory to get the OM/DM driver license from the Run coordination. 1th RPC General Meeting - Pigi Paolucci

  12. 2010 Data analysis • We already have a lot of data to analyze and to publish: • Muon performance paper is already under development: • Some results have been already approved (efficiency) • We have to understand better other sections (noise) • Editorial board it is now ready to work • Conference talks and posters have to be defined in advance (at leas 2-3 months) • Instrumentation Conferences are a very good training center for phd students and not only. 1th RPC General Meeting - Pigi Paolucci

  13. Scientific results to underline • 2010 results: many already approved in March • Noise studies: linear dependence rate .vs. luminosity • FEB configuration: great improvements (Anton, Karol, Philip) • HV scan: great success of the RPC collaboration See next presentations 1th RPC General Meeting - Pigi Paolucci

  14. Steering Committee • Chairman: HafeezHoorani • Members: A. Colaleo, M. Maggi, A. Sharma, W. Van Doninck • The RPC management board will consult the SC to get help on very urgent and crucial tasks and to solve delicate scientific issues. • The experience of the 5 senior physicists members is a guarantee for the RPC project and will help us a lot in the future. 1th RPC General Meeting - Pigi Paolucci

  15. HV scan – sociological exercise • Steering Committee was consulted to give us guidelines about the “calculation” of the high voltage working point of every single chamber. • The answer was fast, very professional and clear. Let me thanks a lot the committee. • Run and Technical coordination did a great job in organizing the data taking and in following it hour by hour (pressure correction, threshold setting….) • DPG team was able to provide results in real time (weekend) • Info and results circulated in the best way • A first exercise of cross-coordination and coherent work in the RPC project 1th RPC General Meeting - Pigi Paolucci

  16. HV scan results • Marcello, Cesare and Juan Pablo are now working and the data analysis in the DPG team. • Many chambers were already working in plateau during the 2010 data taking but not all (see Marcello talk) • 2011-2010 comparison • Working points • Cluster size check 1th RPC General Meeting - Pigi Paolucci

  17. Noise studies • Noise group (Silvia, Mihee and Mircho) is doing a great job and it was not so easy to clean the data in order to spot the linear increase 1th RPC General Meeting - Pigi Paolucci

  18. FEB configuration • There was a big effort to improve the FEB configuration in few weeks !! • Now parameters are automatically loaded by the database • The procedure is 5-6 times faster thanks to a firmware review • A WEB GUI allow us to write/read the configuration parameters (different views) HERE THE TEAM • Filip- main developer of the C++ part, • Karol - main developer of the Java part, also responsible for configurationDB • Anton - main tester of the product, main provider of ideas • Krzysztof - main developer of the Trigger Supervisor • SajjadAsghar- coordinator of the DB activities. • Imran and Atif- developers of the GUI. • Let me thanks Hafeez and the Pakistan database experts to join the group. 1th RPC General Meeting - Pigi Paolucci

  19. 2010 results • Many results obtained by the DPG group have been approved by the RPC collaboration (efficiency, cluster size, spatial resolution, muography…) 1th RPC General Meeting - Pigi Paolucci

  20. 2011 Agenda • General Meeting: Thursday at 9:30 (1per month) • DPG/RC: Thursday at 9:30 (3 per month) • Tech coordination: Monday at 9:00 (weekly) • Upgrade: Tuesday at 9:00 (weekly) • Management: Wed at 10:00 (weekly) restricted • ISR meeting: Monday 14:00 (weekly) technical • 904 meeting: Wed 10:00 (weekly) technical • GEM meeting: Tuesday 14:00 (weekly) technical • Upgrade RE4 Workshop to be decided • Upgrade High Eta Workshop to be decided Let me ask the 4 coordinators and deputies to actively participate to the 3 weekly meetings. Unique project 1th RPC General Meeting - Pigi Paolucci

  21. Construction and docDB • I would like to remind you we have hired a DB expert (Daniela) to work for 3 months on the construction DB. • She is doing a very good job but is now stuck for lack of information and collaboration. • Question: if the construction DB is not on top of our list of priority I will close to task • Anton is supervising both the construction DB and docDB • RPC docDB is almost ready. We need to clean our twiki page • http://dev-cms.web.cern.ch/ 1th RPC General Meeting - Pigi Paolucci

  22. RPC “social” dinner tonight at 20:30 • La Villa du Lac – Divonne Les Bains • It is just in front le lake • Sorry but not more than the 34 people already registered • From Highway: • after the “douane” go straight • turn right at the second roundabout • After 400 meter there is a roundabout, go straight • The Hotel is on the left • From GEX: • Follow “highway to Geneve” indication. • Then indication to “promenade” or “Villa du Lac” 1th RPC General Meeting - Pigi Paolucci

  23. Conclusions • RPC project is in good shape • Two years of data taking + upgrade is not an easy job for a small collaboration. We are 80 people • Let me stress again that we have to improve and stabilize the present project and then eventually move manpower to the upgrade 2013-2014. Right now is still not the case !! • It is important to work in a coherent way as we did for the HV scan and FEB configuration • See you this evening  1th RPC General Meeting - Pigi Paolucci