RPC project status. Muon Institution Board 29 March 2011 Pigi Paolucci. RPC organization chart 2011-2012. Conference Committee S. Park, B. Pavlov. Editorial board S. Qian , M. Abbrescia S. Bianco. Institution Board L. Litov. Steering committee W. Van Doninck , M. Maggi
E N D
RPC project status Muon Institution Board 29 March 2011 Pigi Paolucci
RPC organization chart 2011-2012 Conference Committee S. Park, B. Pavlov Editorial board S. Qian, M. Abbrescia S. Bianco Institution Board L. Litov Steering committee W. Van Doninck, M. Maggi H. Hoorani, A. Colaleo, A. Sharma (PM+DPM+RC+TC+DPG) Project Manager P. Paolucci M. Tytgat & G. Pugliese Resource manager P. Paolucci ad interim DPG D. Piccolo K. Bunkowski C. Carillo Tech. Coordination S. Buontempo A. Dimitrov Run Coordinator L. Benussi H. Shahzad N. Zaganidis Upgrade G. Iaselli Sharma S. Buontempo 1th RPC General Meeting - Pigi Paolucci
DPG D. Piccolo K. Bunkowsk C. Carillo Run Coordinator L. Benussi H. Shahzad N. Zaganidis Detector & trigger analysis C. Carillo Phys Valid Tool S. Costantini Offline D. Piccolo Online K. Bunkowski Local Reco C. Carrillo DQM A. Cimmino ConfigurationK. Bunkowski Detector perfomance C. Calabria SoftwareValidation/ Data Certification J. Gho Run Quality Tae Jeong Detector DB Detector impact on trigger Resp. Simulation B. Pavlov Noise tools S. Costantini Trigger DB M Szlepper Calibration Streams M. Maggi DataBase M. Maggi WBM U. Berzano DCS Non event data P. Petkov Skims S. Tupputi DPG-POG Min Suk Kim Upgrade Resp. Covered RPC organization chart Manpower needed Not covered
Upgrade G. Iaselli A. Sharma S. Buontempo Technical Coordination S. Buontempo A. Dimitrov High eta Bakelite HPL Mainten. & repair. (RE,RE) Dimitrov & Shahzad Electronics F. Loddo Chamber instal. Gap production DCS hardware Resp. Cable instal. Power system Chamber mechanics Test beam Nicolas Cooling J. Crotty Off-detector electronic Chamber design Documentation Dimitrov Gas Benussi Power cable GIF activity Ghent site M. Tytgat R&D N. Zaganidis India site L. Pant Chamber production Signal cable Equipment DB D. Uzunova Trigger Warsaw CERN site CERN CERN test stand CERN RE1/1 at P5 Commissioning at P5 Chamber QC at CERN Run coordination & Upgrade Covered RPC IB meeting - Pigi Paolucci Manpower needed Not covered
Organization chart • All the positions are now covered but not for the upgrade • I’m glad to have many phd student and post-doc in the LV3 • Most of them are in the DPG and are participating to the data analysis of the RPC and Trigger performances • Bari, Ghent, Korea, Sofia, Uniandes……. • Let me underline the perfect integration of the 6 Korean Phd and post-doc. 3 of them are already in the DPG chart. 1th RPC General Meeting - Pigi Paolucci
Main goals – 2011-2012 • Main scientific goals are: In priority order • High efficiency of the RPC data taking TC/RC • Assure an high quality of the data DPG/RC • Clear set of results (performance and studies) DPG • Build the RE4 upgrade system TC/Up • Enlarge the collaboration MB/IB • Manpower balance & budget consolidation MB/IB 1th RPC General Meeting - Pigi Paolucci
Scientific results to underline • 2010 results: many already approved in March • Noise studies: linear dependence rate .vs. luminosity • FEB configuration: great improvements (Anton, Karol, Philip) • HV scan: great success of the RPC collaboration See next presentations 1th RPC General Meeting - Pigi Paolucci
Steering Committee • Chairman: HafeezHoorani • Members: A. Colaleo, M. Maggi, A. Sharma, W. Van Doninck • The RPC management board will consult the SC to get help on very urgent and crucial tasks and to solve delicate scientific issues. • The experience of the 5 senior physicists members is a guarantee for the RPC project and will help us a lot in the future. 1th RPC General Meeting - Pigi Paolucci
HV scan – sociological exercise • Steering Committee was consulted to give us guidelines about the “calculation” of the high voltage working point of every single chamber. • The answer was fast, very professional and clear. Let me thanks a lot the committee. • Run and Technical coordination did a great job in organizing the data taking and in following it hour by hour (pressure correction, threshold setting….) • DPG team was able to provide results in real time (weekend) • Info and results circulated in the best way • A first exercise of cross-coordination and coherent work in the RPC project 1th RPC General Meeting - Pigi Paolucci
HV scan results • Marcello, Cesare and Juan Pablo are now working and the data analysis in the DPG team. • Many chambers were already working in plateau during the 2010 data taking but not all (see Marcello talk) • 2011-2010 comparison • Working points • Cluster size check 1th RPC General Meeting - Pigi Paolucci
Noise studies • Noise group (Silvia, Mihee and Mircho) is doing a great job and it was not so easy to clean the data in order to spot the linear increase 1th RPC General Meeting - Pigi Paolucci
FEB configuration • There was a big effort to improve the FEB configuration in few weeks !! • Now parameters are automatically loaded by the database • The procedure is 5-6 times faster thanks to a firmware review • A WEB GUI allow us to write/read the configuration parameters (different views) HERE THE TEAM • Filip- main developer of the C++ part, • Karol - main developer of the Java part, also responsible for configurationDB • Anton - main tester of the product, main provider of ideas • Krzysztof - main developer of the Trigger Supervisor • SajjadAsghar- coordinator of the DB activities. • Imran and Atif- developers of the GUI. • Let me thanks Hafeez and the Pakistan database experts to join the group. 1th RPC General Meeting - Pigi Paolucci
2010 results • Many results obtained by the DPG group have been approved by the RPC collaboration (efficiency, cluster size, spatial resolution, muography…) 1th RPC General Meeting - Pigi Paolucci
2011 Agenda • General Meeting: Thursday at 9:30 (1 per month) • DPG/RC: Thursday at 9:30 (3 per month) • Tech coordination: Monday at 9:00 (weekly) • Upgrade: Tuesday at 9:00 (weekly) • Management: Wed at 10:00 (weekly) restricted • ISR meeting: Monday 14:00 (weekly) technical • 904 meeting: Wed 10:00 (weekly) technical • GEM meeting: Tuesday 14:00 (weekly) technical • Upgrade RE4 Workshop to be decided • Upgrade High Eta Workshop to be decided Let me ask the 4 coordinators and deputies to actively participate to the 3 weekly meetings. Unique project 1th RPC General Meeting - Pigi Paolucci
Conclusions • RPC project is in good shape • Two years of data taking + upgrade is not an easy job for a small collaboration. We are 80 people • Let me stress again that we have to improve and stabilize the present project and then eventually move manpower to the upgrade 2013-2014. Right now is still not the case !! • It is important to work in a coherent way as we did for the HV scan and FEB configuration 1th RPC General Meeting - Pigi Paolucci