110 likes | 247 Views
Testing components for B-sensitivity TB 23.6.04 L.Jirden. Progress Summary. TOF. TOF. TOF. TOF. TRD. TRD. TRD. V0. FMD. Acorde. Acorde. TS/EL. T0. T0. Sniffer. Sniffer. FMD. V0. TPC. TRD. TRD. TRD. TOF. TOF. TOF. TOF. MTRG. MTRG. MTRG. MTRG. EXD 4/29. EXD 5/29.
E N D
Testing components for B-sensitivity TB 23.6.04 L.Jirden • Progress • Summary
TOF TOF TOF TOF TRD TRD TRD V0 FMD Acorde Acorde TS/EL T0 T0 Sniffer Sniffer FMD V0 TPC TRD TRD TRD TOF TOF TOF TOF MTRG MTRG MTRG MTRG EXD4/29 EXD5/29 37 30 29 22 21 14 13 5 4 1 B ~ 110 Gauss 39 38 MTRK 13 9 MTRK TPC MTRK MTRK MTRK TOF TOF MTRG MTRG MTRG TPC MTRK 16 12 8 1 C ~ 50 Gauss EXD2/29 PMD SPD SSD 5 1 TPC CTP CTP 23 20 17 D ~ 200 Gauss PHOS PMD SPD SSD 10 6 EXD3/29 TRD CTP CTP Vacu PHOS TPC TPC SDD 15 11 TRD CTP CTP 25 22 19 TS/EL TPC TPC SDD 20 16 EXD1/29 MTRK MTRK MTRK LHC LHC MTRG MTRG MTRG 38 34 MTRK 33 26 MTRK MTRK 41 37 A ~ 110 Gauss HMPID HMPID HMPID TOF TOF TOF TRD TRD TRD SSD TS/EL SPD SPD SDD SDD SSD SSD SSD TPC TRD TRD TRD TOF TOF TOF MTRG MTRG MTRG MTRG EXD6/29 EXD7/29 38 30 29 22 21 14 13 5 4 1 Based on rackalloc.doc 16/04/04 jpv
Tests • Verification of the model for UX stray fields • measurements in the UX: H.Taureg • Contribution of L3 and Muon magnets individually • At critical rack locations, outside/inside racks • Equipment functionality tests: detector groups • Inside L3 magnet and in the UX • When: • August 2004 • Test of critical devices • Any device that might be sensitive to low B-fields: • Power supplies, ethernet devices, etc • When: • Started in May 2004
Power distribution & Racks Power limited to ~ 3 kW per rack • all ux rack users to check and adapt their rack layout ! • Rack application for DCDB will be prepared
PLC’s • PLC’s have relays and transformers but no ventilators • Probably ok for >200 Gauss • Should nevertheless be checked
Ethernet • Detector groups to precise to integration team (J-P.Vanuxem) in which racks and for what equipment ethernet is required.
Other equipment • UX users to check/test any other equipment which might be sensitive to B-field. • Test facilities at CERN: • TA1 Magnet Lab B-168 • Gap ~ 25 cm reservation: W.Flegel, PH/TA3 • CMS Magnet Lab B-887 • Gap ~ 50cm reservation: B.Cure, PH/CMI • dipole in T7 beam-line, east hall • Gap ? reservation: SPS coordinator • GOLIATH dipole in H4 beam-line • Gap ? reservation: SPS coordinator
Summary of actions I • Verify the B-field model for UX • TC in August • Check rack dissipation < 3kW • Rough overview: TC + detectors in July – August • Systematic check (DCDB): TC + det. before end 04 • Move all HVPS to the counting rooms • Okay from detectors in next TB • Follow-up the implications for the LVPS • To be included in common LVPS specification: TC + detectors before September
Summary of actions II • Test ethernet switches • TRD team before purchase • Test devices with ethernet ports • Identify the devices: TC + detectors in July - August • Test devices: detectors as soon as possible • Verify implications of water cooled LV & VME PS • Change orders, exchange already ordered crates: detectors as soon as possible • Water supply and piping: TC before end 04 • Verify all devices foreseen for ux • B-field tolerance to be entered systematically in DCDB: detectors before end 04