Testing components for B-sensitivity TB 23.6.04 L.Jirden

Testing components for B-sensitivity TB 23.6.04 L.Jirden. Progress Summary. TOF. TOF. TOF. TOF. TRD. TRD. TRD. V0. FMD. Acorde. Acorde. TS/EL. T0. T0. Sniffer. Sniffer. FMD. V0. TPC. TRD. TRD. TRD. TOF. TOF. TOF. TOF. MTRG. MTRG. MTRG. MTRG. EXD 4/29. EXD 5/29.

dom
Download Presentation

Testing components for B-sensitivity TB 23.6.04 L.Jirden

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Testing components for B-sensitivity TB 23.6.04 L.Jirden • Progress • Summary

  2. TOF TOF TOF TOF TRD TRD TRD V0 FMD Acorde Acorde TS/EL T0 T0 Sniffer Sniffer FMD V0 TPC TRD TRD TRD TOF TOF TOF TOF MTRG MTRG MTRG MTRG EXD4/29 EXD5/29 37 30 29 22 21 14 13 5 4 1 B ~ 110 Gauss 39 38 MTRK 13 9 MTRK TPC MTRK MTRK MTRK TOF TOF MTRG MTRG MTRG TPC MTRK 16 12 8 1 C ~ 50 Gauss EXD2/29 PMD SPD SSD 5 1 TPC CTP CTP 23 20 17 D ~ 200 Gauss PHOS PMD SPD SSD 10 6 EXD3/29 TRD CTP CTP Vacu PHOS TPC TPC SDD 15 11 TRD CTP CTP 25 22 19 TS/EL TPC TPC SDD 20 16 EXD1/29 MTRK MTRK MTRK LHC LHC MTRG MTRG MTRG 38 34 MTRK 33 26 MTRK MTRK 41 37 A ~ 110 Gauss HMPID HMPID HMPID TOF TOF TOF TRD TRD TRD SSD TS/EL SPD SPD SDD SDD SSD SSD SSD TPC TRD TRD TRD TOF TOF TOF MTRG MTRG MTRG MTRG EXD6/29 EXD7/29 38 30 29 22 21 14 13 5 4 1 Based on rackalloc.doc 16/04/04 jpv

  3. Tests • Verification of the model for UX stray fields • measurements in the UX: H.Taureg • Contribution of L3 and Muon magnets individually • At critical rack locations, outside/inside racks • Equipment functionality tests: detector groups • Inside L3 magnet and in the UX • When: • August 2004 • Test of critical devices • Any device that might be sensitive to low B-fields: • Power supplies, ethernet devices, etc • When: • Started in May 2004

  4. Power distribution & Racks Power limited to ~ 3 kW per rack • all ux rack users to check and adapt their rack layout ! • Rack application for DCDB will be prepared

  5. HV & LV Power Supplies

  6. PLC’s • PLC’s have relays and transformers but no ventilators • Probably ok for >200 Gauss • Should nevertheless be checked

  7. Ethernet • Detector groups to precise to integration team (J-P.Vanuxem) in which racks and for what equipment ethernet is required.

  8. VME

  9. Other equipment • UX users to check/test any other equipment which might be sensitive to B-field. • Test facilities at CERN: • TA1 Magnet Lab B-168 • Gap ~ 25 cm reservation: W.Flegel, PH/TA3 • CMS Magnet Lab B-887 • Gap ~ 50cm reservation: B.Cure, PH/CMI • dipole in T7 beam-line, east hall • Gap ? reservation: SPS coordinator • GOLIATH dipole in H4 beam-line • Gap ? reservation: SPS coordinator

  10. Summary of actions I • Verify the B-field model for UX • TC in August • Check rack dissipation < 3kW • Rough overview: TC + detectors in July – August • Systematic check (DCDB): TC + det. before end 04 • Move all HVPS to the counting rooms • Okay from detectors in next TB • Follow-up the implications for the LVPS • To be included in common LVPS specification: TC + detectors before September

  11. Summary of actions II • Test ethernet switches • TRD team before purchase • Test devices with ethernet ports • Identify the devices: TC + detectors in July - August • Test devices: detectors as soon as possible • Verify implications of water cooled LV & VME PS • Change orders, exchange already ordered crates: detectors as soon as possible • Water supply and piping: TC before end 04 • Verify all devices foreseen for ux • B-field tolerance to be entered systematically in DCDB: detectors before end 04