1 / 16

WELCOME

WELCOME. To. Company Overview. Founded 1989 75 Staff Members 2 Shifts – Expanded (6AM-1AM) 20,000 Square Feet Facility ISO 9001:2000 Registered Unannounced ISO Audits IPC 610 Certified J-STD-001 Certified

domenico
Download Presentation

WELCOME

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WELCOME To

  2. Company Overview • Founded 1989 • 75 Staff Members • 2 Shifts – Expanded (6AM-1AM) • 20,000 Square Feet Facility • ISO 9001:2000 Registered • Unannounced ISO Audits • IPC 610 Certified • J-STD-001 Certified • Extensive BGA Evaluation Capabilities Including X-ray and End-Scope Optical Inspection • ITAR Registered • Conceptual Design Engineering • PWB Layout • Quick-Turn Prototypes. • Pre-production & Production Runs • Exotic Materials • Smallest Comp – 0201’s • Largest Comp BGA’s 1800 Balls uBGA’s • Full Turnkey Capabilities • Fully Staffed Purchasing Dept • Design Thru Assembly and Test

  3. Manufacturing Capabilities • Leaded, RoHS, and Mixed Technologies • High Layer Count, Up to 32 Layers • Quick Reaction Prototyping Services • Pre-Production & Production Runs • Smallest Component Size Placed, 0201 • Largest SMT Processed Board Size 36” by 48” • In Excess of 2000 BGA’s Placed Each Month • Largest BGA, 1800 Balls • u BGA’s, Fine Pitch Placed • In House BGA Rework and Re-balling Expertise • Largest # BGA’s Places on Single Board, 64 • X-Ray and Endo-Scope BGA Inspection • Automatic Optical Inspection (AOI) • Functional Testing Services

  4. Unannounced ISO Audits 3 Times a Year

  5. ITAR REGISTRATION

  6. Equipment List

  7. Quality Management System Quality System SOP 4.01 & SOP 4.02 Management Responsibility Contracts SOP 4.03 Contract Review Design • ECN Change control • Customer approval SOP 4.04 Design • Program combine like material • Subcontract review • Approved vendor list • ECN change control Procurement SOP 4.06 Purchasing Incoming Insp • Received material • Bare board testing • Match purchase orders SOP 4.10 Inspect ISO 9001:2008 Registered

  8. Quality Management System • Verify to BOM • Supply Documentation • Create travelers • Measure accuracy Kit Verification SOP 4.09 Process Control Operations SOP 4.09 Process Control • Process control • Traveler • Traceability In-Process Insp • Measurement • Prevention SOP 4.10 Inspect • 100% • Measurement • Documentation Control • Process feedback Final Insp SOP 4.10 Insp. Test • In-circuit • Functional • ESS • Measure 1st pass yield SOP 4.10 Insp. & Test ISO 9001:2008 Registered

  9. Quality Management System • Controlled documents • ECN control • Customer documents Document Cont SOP 4.05 Document and Data control Customer Prod SOP 4.07 Control of customer supplied products Traceability SOP 4.08 Product Identification and Traceability Measuring SOP 4.11 Control of Measuring, Inspection and Test Equipment • CAR • Training Corrective Action SOP 4.14 Corrective and Preventative Action ISO 9001:2008 Registered

  10. Quality Assurance System Product Flow General

  11. Quality Assurance System Product Flow General

  12. Quality Assurance System Product Flow General

  13. Product Flow Typical

  14. Quality Policy Statement

  15. Thank You

More Related