An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BASS Asia Customer Forum, 26- 27 Nov 2013 Mandarin Oriental Kuala Lumpur, Malaysia BASSnet Maintenance Name: Oliver Roldan Mesina Title: Product Consultant Business Applications and Solutions for Shipping

  2. AGENDA

  3. What is BASSnet™ Maintenance? • A system to facilitate maintenance processes onboard and across a fleet by establishing standard jobs that are required to maintain Components. • Manage materials used for maintenance jobs such as Spare Parts, Consumables, Tools etc. • Keeps track of jobs that have been performed on each Component. • Set up future job planning for Components. • Manage resource planning for jobs by carrying our resource forecasting. • Manage the beginning to end monitoring of Hull Inspections. Keep track of a list of job orders raised specifically for defective components across the fleet. • Track and monitor all components and parts under warranty and the end to end claim process.

  4. MAINTENANCE COMPLETE PROCESS FLOW Component History Routine Task Scheduled Jobs Material Claims Calendar Jobs Counter Jobs Defect Management Requisition Job Order HULL Inspections

  5. BASSnet™ Maintenance The following illustrates the maintenance workflow and its relationships with other modules. Standard Instruction (Created from Office) From Scratch / Manuals Scheduled Job Risk Assessment Component Materials Resource Documents Report Job Done Create Job Order Job History

  6. DEFECTS Unplanned Maintenance Defect found Create Defect Jobvia Defects sub module Create Job Order via Job Order sub module Defects record created in Defects module Connect multiple Defect Job Order Perform Maintenance or take corrective action If Component under ‘Guarantee ‘, link available to Guarantee Claims sub module. On board / Service Repair During Dry-Dock Manage Guarantee Claims process The Defects History displays a list of all Defects-Job records moved to Job History.

  7. ROUTINE TASK Routine Tasks Set up Routine Tasks Report Job Done- Fill up details • Types of routine tasks (Customisable) • Megger Tests • EO • Safety tasks Update to History if everything OK If Failure? Name the Task Define Job Description Create New Job Order Select existing scheduled Jobs and create Job order from them Define Recurrence Attach respective components Report Job Done for Job Order Move to History

  8. CLAIMS Action: Repair breakdown with tools onboard and order parts as needed. NO Breakdown of equipment Equipment covered under warranty? YES YES Create a Claim record using the Guarantee Claims sub module. Status: NEW Create Job Order in System with Job Class = Guarantee Claim. Status: NEW Claim to be settled and closed by CC. The CC will add defect to Monthly Report. Status: Rejected by Claims Coordinator. NO Claim Accepted by CC? YES Status: Accepted by Claims Coordinator. Claim will be sent to Shipyard for investigation. Shipyard will update CC. Status: Rejected by Yard/Supplier. Claim to be solved by Ship's crew and closed by CC. NO Claim Accepted by Yard? YES Status: Approved by Yard/Supplier. New parts will be sent by Yard to Vessel. Broken parts to be sent back to Yard (if requested). Vessel User to update system regarding landed/arrived parts. Status: Under Repair/Replace. Repairs or replacements are carried out onboard vessel. Status: Closed Defects corrections completed. CC closed claim.

  9. HULL INSPECTION Scheduled Job On Hull Inspections Set up New Hull Inspection Report Job Done Ensure required Registers have been set up: Register Setup - Maintenance Update Hull Inspection report Hull Structure – hull profile Enter the Overall Condition of the hull noted during the Inspection Assessment Category codes Overall Condition codes Assessment Scales codes Attach Documents relating to the inspection. Note Observations from the Inspection – enter observations for each Surface Area. Hull Compartment codes Add Images Move to History Note: Inspected Date, Condition and Observations must be entered before moving to history. Use Hull Inspection Overview to track and monitor all aspects of a Hull Inspection

  10. Thank You www.BASSnet.no sales@bassnet.no

  11. Component (i) - component transfer workflow - use status/maintenance status explanation - filter feature - locate at SFI tree view feature - find grid – added 1 new column – document flag (clear all filters) - batch update feature - drag & drop at SFI structure (re-position) (ii) - remove sub component, option to "Keep this sub component as spare" - Sub component transfer - Sub component transfer process - Create sub component and Convert from spare part - Access right – transfer access right

  12. Maintenance overview • Maintenance job – “Require to replace sub component(s) • Standard instruction • Batch update (Length, & type) • Schedule job • Find grid (package job and sub component indicator) • Discussion (Schedule job/job order/job history/material) • Estimate cost • New design - Schedule Job/Job order wizard, • Job Packaging – view all materials • Job History – By default will retrieve 1 year job history • Job order re-plan workflow • Counter • Export to excel for all the previous counter reading

  13. Planner • Resource Forecast/Resource Time Sheet • Routine task • - 2 templates link to multiple routine task type • - Distribute task to other vessels • - Description field (unlimited length) • - Print report • - Overview • Defects • - Save Image into picture file • - Transfer to Project • Claim • ( To check should only filter job belong to that damage component) • Hull Inspection • – History tab (combine job history and hull inspection history) • - Due date column

  14. Material • - Overview – new design – improve performance • - Access right base on category • - Location diagnostic • - Print label • - Change distribution group • - Propose category for free item • - Report – material stock report (Grid view and grouping) • - Report – material transaction (Grid view) – include vessel ref, and • - Group by vessel