1 / 15

PWI: Plasma Wave Instrument

PWI: Plasma Wave Instrument. Update of the PWI status (after the previous SWG). Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October 18: EMC board meeting (ISAS) November 21: EGSE Meeting ( Meudon ) PWI Common GSE

donald
Download Presentation

PWI: Plasma Wave Instrument

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PWI: Plasma Wave Instrument

  2. Update of the PWI status (after the previous SWG) Past major events: October 13: PWI 6th Kyoto meeting(Kyoto Univ.) Discussion of the electrical interface and EMC October 18: EMC board meeting (ISAS) November 21:EGSE Meeting(Meudon) PWI Common GSE December 6: EMC tests of TWTA (Kanazawa)

  3. EWO • BBM Development & Tests: • DC CAL/BIAS、Loop gain control • LPF of WFC/OFA/EFD-E & B AM2P • Power supply : • Voltage conversion- Usage of -12V ->-5V • -> increase of power consumption • Under the discussion of the size and weight • considering the additional functions • (To be discussed this week in Kanazawa)

  4. SC-LF/SC-DB

  5. MEFISTOupdate 22 March 2006 • Max. amplitude (LF) 500 mV/m • Bit resolution 0.015 mV/m • Spacecraft potential -100 to +100 V • Frequency range DC – 3 MHz Sensor wire, 0.1-0.3 mm 1-2 m 13-14 m TiAlN probe 40 mm diameter “puck” Boom, connected to s/c ground

  6. Second-Surface Mirror Development Work is on-going to develop an SSM, mainly for the boom wire. Goal is to achieve: • Mechanical flexibility • Electrical conductivity, to keep all satellite surface potentials within ~1V • Temperature below 150°C to avoid damage to wire insulator material

  7. Thermal Modelling • Thermal model of MEFISTO “stand-alone” has been developed and run • All temperatures within acceptable limits for all mission phases • Model has been supplied to JAXA, for integration with spacecraft level model • Currently model details are being discussed and iterated with JAXA thermal engineers

  8. Electronics • Design and development of flight electronics is proceeding as planned • Co-ordinated EGSE development in Europe is progressing Mechanics • Design and development of flight machannics is proceeding as planned

  9. Funding status • Swedish National Space Board • Royal Institute of Technology • Swedish Institute of Space Physics have signed funding commitments

  10. Requests (reminder) • Normal sun angle > 92 deg, i.e., 93 +/- 1 deg, if possible • Maximum potential difference on external surfaces of order 1 V, i.e., all external surfaces must be (reasonably) conductive

  11. SORBET instrument bloc diagram

  12. New ASIC design (January 2006) • Analogue functions on a single chip : • Specific design (Full Custom) • Thin CMOS technology (AMS 0.35um) • 2 logarithmic amplifiers (AGC) • 2 low noise mixers • 1 selective band-pass filter • 1 low noise operational amplifier • Functional testing showed : • Good performances • Improvement of the dynamic range • Less power needed • Future actions • Thermal testing (soon) • Radiation evaluation (2Q/2006) • Decision to continue the ASIC solution (3Q/2006) 2.6mm 2.6mm

  13. Major Events in the future March, 2006: PWI local meeting in Kanazawa March 2006: EMC tests of the MSASI motor

  14. PWI 前回設計会議からの進捗状況 今後の予定 ●エレキ EWO-EFD: 回路設計 DC CAL/BIAS、Loop gain control EWO-WFC/OFA: 回路設計 センサとのインタフェース、AC CAL レベルダイアグラム SORBET: EWOとのインタフェース AM2P: LVDS: +20g、電力3倍? MEFISTOレングスモニタ検討中 CMD&STATUS CAL信号 → EWOへ 観測シーケンス検討 BBM製作・特性試験(富山県大) (BIAS/CAL、LGC、FPGA) フィルタBBM製作(MHI)         特性試験(京大)

  15. PWI 前回設計会議からの進捗状況 今後の予定 ●その他 Software / operation: データ取得シーケンス検討(金沢大) 各センサ/受信機 ⇔ MDP EMC: MMO EMC Meeting(10/18:ISAS) → EMC ver.1.11 TWTA EMC試験(12/6:金沢大) RE-02 / RE-04(電界 / 磁界) CDC(電流) MDP-2内接地方式: 1点接地を基本 アナログ観測信号は差動受渡 cf. multiple ground: for clean E single ground: for clean B 基本案確定(3月:PWI+MDP) MSASIモータEMC試験(3月:金沢大) 具体的議論(3月)

More Related