Compressor ReVamp and Fabrication

This update covers the revised concept generation for the Compressor ReVamp and Fabrication project, including selected concepts and scheduled conference calls and visits with contractors and Dresser-Rand. It also outlines the installation process, safety measures, documentation, training, and data acquisition plans. Please note that actual tests and data collection with the acquisition unit cannot be performed as the team does not have access to the compressor.

dowens
Download Presentation

Compressor ReVamp and Fabrication

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Compressor ReVamp and Fabrication PO9452

  2. Update • Revised Concept Generation • Selected some concepts • Scheduled Conference call with Dresser Rand • Schedules Visit to Dresser Rand for Week 5 to have Design Review

  3. Architecture

  4. Sub System Break Down

  5. Installation -Room Reinforcements/Structural Analysis • Electrical (Contractor) • HVAC (Contractor) • Water Supply (Contractor) • Rigger and Install (Contractor) • Noise and Vibration Control • Room Access/Safety • Installation Guide Setup and Configuration -Safety Training/Signage -Accessible Documentation -Sensor Connection - Computer and Software installation Safety -Eye/Ear Protection -Call out moving signs -Physical Buffers -Emergency Shutoffs -Training (Dresser-Rand) -Operation & Maintenance Manual Research Tool -Data Acquisition -Variable valve timing Mechanism -Analyses Teaching Interface -Data Acquisition -Custom Interface Per Class -Lab Manuals, Guides, Examples -Usability Tests -Staff Feedback Analyses DAQ -LabView Sensors -Documentation -Layout & Configuration -Analysis and Modeling -Custom Sensors -Analysis

  6. Risks Concerns • The compressor drawings given are preliminary • Since team is not receiving compressor, actual tests can’t be done to collect data with acquisition unit