60 likes | 69 Views
This update covers the revised concept generation for the Compressor ReVamp and Fabrication project, including selected concepts and scheduled conference calls and visits with contractors and Dresser-Rand. It also outlines the installation process, safety measures, documentation, training, and data acquisition plans. Please note that actual tests and data collection with the acquisition unit cannot be performed as the team does not have access to the compressor.
E N D
Update • Revised Concept Generation • Selected some concepts • Scheduled Conference call with Dresser Rand • Schedules Visit to Dresser Rand for Week 5 to have Design Review
Installation -Room Reinforcements/Structural Analysis • Electrical (Contractor) • HVAC (Contractor) • Water Supply (Contractor) • Rigger and Install (Contractor) • Noise and Vibration Control • Room Access/Safety • Installation Guide Setup and Configuration -Safety Training/Signage -Accessible Documentation -Sensor Connection - Computer and Software installation Safety -Eye/Ear Protection -Call out moving signs -Physical Buffers -Emergency Shutoffs -Training (Dresser-Rand) -Operation & Maintenance Manual Research Tool -Data Acquisition -Variable valve timing Mechanism -Analyses Teaching Interface -Data Acquisition -Custom Interface Per Class -Lab Manuals, Guides, Examples -Usability Tests -Staff Feedback Analyses DAQ -LabView Sensors -Documentation -Layout & Configuration -Analysis and Modeling -Custom Sensors -Analysis
Risks Concerns • The compressor drawings given are preliminary • Since team is not receiving compressor, actual tests can’t be done to collect data with acquisition unit