1. NSAP Technology Refresh NTRProjectNSG Briefing NTR Project Manager: Vicki Stewart
NTR Lead Engineer: Scott Douglas
October 16, 2006
2. 2 035- AGENDA:
NTR Architecture
NTR Project Status
NTR Operational Services
Customer Readiness/Acceptance Approach
NISN/NASCOM Transition Approach and Support
NTR Team
3. 3 035-
4. 4 035- Project Status:
QoS testing in AT&T Lab Completed
QoS testing by Goddard IPNOC started this week
Timing Change fully implemented by October 18th.
Transition Schedule through November was reviewed with sites this week. Next phase will be discussed at the MCWG in October.
5. 5 035- Operational Services:
NTR Backbone:
EOS High Rate:
GSFC (3/14)/Norway/WSC Operational
GSFC (32)/Norway Operational
Complete implementation diverse route is dependent on QoS on the NTR Core Backbone between JPL, GDS, WSC and JSC
GSFC/DFRC Operational
DSN Madrid:
International Services:
DSN Primary Route:
JPL/GSFC (3/14) Operational
GSFC (3/14)/NY Operational
NY/Madrid Operational
DSN Backup Route:
GDS/WSC (T1) Under Implementation
WSC (T1)/GSFC (3/14) Pending QoS
GSFC (3/14)/Madrid Accepted
Transitions began October 11th
Closed IOnet: JSC-WSC 10/11/06
Closed IOnet: JSC-GSFC 10/13/06
Closed IOnet: JSC-WSC 10/16/06
DHEM-956583 JSC-GSFC 10/12-13/06
DHEM-956823 GSFC-PALS 10/17/06
6. 6 035- Point-to-Point T1s:
GSFC/SBRY Operational
GSFC/SUIT Operational
GSFC/PSU Operational
GSFC/LHNM Operational
GSFC/APL Operational
GSFC/CCOL Operational
7. 7 035- Three levels of Customer Acceptance for NTR Transition:
Form # NASCOM-FOR-001-20060927 NASCOM Transition Readiness Form
Form # NASCOM-FOR-002-20060927 NASCOM Mission Operations Acceptance Form
Form # NASCOM-FOR-003-20060927 NASCOM Permission to Turndown NSAP Form
Forms will be faxed to a Primary and Alternate POC for each end of service
8. 8 035- Transition Approach:
Request that each site perform a Continuity Check on each NSAP service prior to transition to NTR.
Establish an NTR Prime and Alternate NASA Point-of-Contact (POCs) for each site
NNSG will issue Release Messages identifying NSAP services to be transitioned on a given date to the supporting sites.
Form # NASCOM-FOR-001-20060927 - NSAP services to transition will be fax to Prime and Alternate NASA POC at each end of service for signature before proceeding
Upon completion of Operational Testing Form # NASCOM-FOR-002-20060927 NTR Acceptance Form will be faxed to Prime and Alternate POC at each end of service for signature.
NNSG will issue Communications Service Advisory Message (CSAM) identifying NTR services accepted for operational use to the supporting sites.
Form # NASCOM-FOR-003-20060927 - NSAP Disconnect Acceptance Form will be faxed to each end of service for signature before a disconnect order is issued.
NISN NSR will be issued for disconnect.
Disconnect Order issued to Carrier
NNSG will issue a Preliminary Service Advisory Message (PSAM) identifying NSAP circuits being disconnected issued to the supporting sites.
Shuttle and JSC transition activities will stop at TCDT date for upcoming Missions.
9. 9 035- NISN/NASCOM Transition Support:
Dedicated Mission COMMGR on console for transition activities.
Dedicated IPNOC Engineer and CD Manager for Testing and Transition of IONET services.
Dedicated TCS Supervisor for all Testing and Transition activities
Dedicated Voice Loop for the transition team
Landline 301-474-6984 will be dedicated for NTR transition support
List of NSAP Services being transitioned will be on console with failback times for each identified.
Post Transition:
CAUTION Service Level Identifiers are the same under NTR as they are under NSAP. When reporting problems to the COMMGR the user needs to identify if the trouble is on the NSAP network or the NTR network.
An MCM makes the determination to fail-back
10. 10 035- NTR Project Team Vicki Stewart, NASA, NTR Project Manager 301-286-6205 Victoria.Stewart@nasa.gov
Scott Douglas, NASA, NTR Lead Engineer 301-286-9550 Scott.Douglas@nasa.gov
Bill Ihnat, UNITeS, NTR Project Manager 301-805-3351 William.H.Ihnat@msfc.nasa.gov
Bob Haines, Lockheed, NTR System Engineer 301-794-2805 RHaines2@csc.com
Bob Sliko, Lockheed, NTR System Engineer 301-794-2502 RSliko@csc.com
Michele Mascari, Lockheed, NTR Lead Engineer 301-794-2514 MMascari@csc.com
Shawn Belton, L3 GSI, Tech Control Supervisor 301-286-3536 SBelton@pop500.gsfc.nasa.gov
Heather Morgan, Lead IPNOC Engineer 301-286-8806 hmorgan@sled.gsfc.nasa.gov
Doug Solomon, Lead CD Manager 301-286-6864 dmsoloma@pop500.gsfc.nasa.gov
Randy Honeycutt, Mission COMMG 301-286-0771 rhoneycu@pop500.gsfc.nasa.gov
Mark Miedzinski, Lockheed, NTR Technical Support 301-794-2827 MMiedzinski@csc.com
Robert Sutton, UNITeS, NTR Implementation Coord. 256-961-9469 Robert.Sutton@nasa.gov
Paul Dixon, UNITeS, NTR Engineer 256-961-9359 Paul.E.Dixon@msfc.nasa.gov
Tom Boggs, NISN Scheduling Coordinator 301-286-5590 hboggs@pop500.gsfc.nasa.gov
Arthur Pettengill, Lockheed, Documentation Support 301-794-2416 APettengill@csc.com
11. 11 035- Questions?