Vacuum Vessel supported and in position to receive left MCWF. Left MCWF moved into position by overhead crane. Left support cart moved into position. Load supported and crane removed. Right MCWF moved into position by overhead crane.
E N D
Vacuum Vessel supported and in position to receive left MCWF
Left support cart moved into position. Load supported and crane removed
Right support cart moved into position. Load supported and crane removed. Shim measurements taken.
Right MCWF supported by crane. Right support cart removed and MCWF backed off 13” (position #38).
Right cart support posts removed and posts for position #38 location installed on cart. Cart positioned and load supported. Crane removed and shim installed on left MCWF
Right MCWF moved into final position by crane. Right cart supports exchanged and initial supports reinstalled. Cart repositioned under MCWF. Load supported by cart, crane removed and final bolting of interface joint occurs