40 likes | 43 Views
Stay updated on the shipping progress for BLM equipment and materials, including head welding components in varying quantities. Key milestones include creation of shipping requests, document registration, truck transport from CERN, unloading at IHEP, and signing procedures. View the detailed timeline for each package delivery and transport method.
E N D
2006 year. • Shipping (#3) of the rest of equipment + materials for 40’s BLM production in April. • 22.02 – EDH Shipping Request created. • 23.02 – The documents registered in qualiac. • 25.02 - Attachment #3 signed by L.Evans and transferred to IHEP Director N.Tyurin for signature. • 01.03 – 23 packages/10335 kg and CERN documents was ready to go. • 17.03 – Transport by Direct Truck from CERN. • 29.03 – Packages was unloaded at IHEP. • Shipping (#4) of the components for 100’s Head welding. • 1.02.03 – EDH Shipping Request created. • 03.03 – The documents registered in qualiac. • 04.03 - Attachment #4 signed by L.Evans and transferred to IHEP Director N.Tyurin for signature. • 03.03 – 1 case/50 kg and CERN documents was ready to go. • 17.03 - Transport by Direct Truck from CERN. • 29.03 – Packages was unloaded at IHEP. • Shipping (#5) of the components for 360’s BLM production in May, including the components for 400’s Head welding. • 1. 14.03 – EDH Shipping Request created. • 2. 15.03 – The documents registered in qualiac. • 3. 16.03 - Attachment #5 was signed by P.Bryant and IHEP Director N.Tyurin. • 4. 15.03 – 3 packages/701 kg was collected by Internal Transport and CERN documents was ready to go. • 23.03 – Transport by Groupage Truck from CERN. • 13.04 – Packages was unload at IHEP
Shipping (#6) of the components for 360’s BLM production in June, including the components for 300’s Head welding. • 1. 4.04 – EDH Shipping Request created. • 5.04. - Attachment #6 signed by L.Evans and transfered to IHEP Director N.Tyurin for signature. • 7.04 - 2 packages/875 kg andCERN documents was ready to go. • 12.04 - Transport by Groupage Truck from CERN. • 06.05 – Packages was unload at IHEP • Shipping (#7) of the components for 360’s BLM production in July, including the components for 1200 Heads welding (July, August, September) and 250 UK Heads. • 18.05 – EDH Shipping Request created. • 18.05. - Attachment #7 signed by P.Bryant and transfered to IHEP Director N.Tyurin for signature. • 23.05 – The documents registered in qualiac. • 24.05 - 6 packages/2305 kg was collected by Internal Transport . • 29.05 - CERN documents was ready • 31.05 Transport by Groupage Truck from CERN. • 27.06 – Packages was unload at IHEP • Shipping (#8) of the components, Detergent and vacuum equipments, including the 50 UK Heads. • 8.06 – EDH Shipping Request created. • 9.06. - Attachment #8 signed by P.Bryant and transfered to IHEP Director N.Tyurin for signature. • 12.06 - 6 packages/965 kg was collected by Internal Transport • 13.06 - CERN documents was ready to go. • 22.06 - Transport by Groupage Truck from CERN • 6. 17.07 – Packages was unload at IHEP
Shipping (#9) of the components for BLM production, including the components for Heads welding. • 1. 18.07 – Shipping was ready. • 2. 18.07 – Shipping Request created in EDH • 3. 19.07. - Attachment #9 signed by P.Bryant and transfered to IHEP Director N.Tyurin for signature. • 4. 25.07 - 9 packages/ 2104.5 kg and CERN documents are ready to go. • 5. 10.08 - Transport by Groupage Truck from CERN • 6. 29.08 – Packages was unloaded at IHEP • Shipping (#10) of the components for BLM production, including the spare vacuum equipment and the components for Heads welding. • 20.09 – Shipping was ready. • 2. 20.09 - Shipping Request created in EDH • 3. 21.09 - Attachment #10 signed by P.Bryant and transfered to IHEP Director N.Tyurin for signature. • 4. xx.09 - 2 packages/ x.x kg and CERN documents are ready to go. • 5. xx.09 - Transport by Groupage Truck from CERN
Shipping #1 of the 40 BLM_IC production (June) • 1. 16.06 – 40 departed from IHEP • 22.06 – 40 arrived at CERN • Shipping #2 of the 360 BLM_IC production (July) • 1. 7.07 – 360 IC are ready to ship. • 2. 25.07 – it departed from IHEP. • 3. 3.08 – it arrived at CERN. • Shipping #3 of the 360 BLM_IC production (August). Transport ordered by CERN. • 1. 10.08 360 IC are ready to ship. • 2. 15.08 – The Lorry departed from IHEP. • 3. 24.08 – The Lorry arrived and unload at CERN. • Shipping #4 of the 360 BLM_IC production (September). Transport ordered by CERN. • 1. 15.09 360 IC are ready to ship. • 2. 19.09 – The Lorry departed from IHEP. • 26.09 – The Lorry expect to arrive at CERN. • 1120 IC at CERN!