krong pa 2 hydropower PLANT. Tran Thanh Lien, Institute of Energy, Vietnam. FEASIBILITY STUDY, VIETNAM 2005. GENERAL. Krong Pa 2 hydropower is located in Krong Pa river which is one of tributaries of Ba river.
E N D
krong pa 2 hydropower PLANT Tran Thanh Lien, Institute of Energy, Vietnam FEASIBILITY STUDY, VIETNAM 2005 KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
GENERAL • Krong Pa 2 hydropower is located in Krong Pa river which is one of tributaries of Ba river. • The dam site is located in DakRong commune, KBang district, Gia Lai province, Vietnam KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
MAIN OBJECTIVES • Krong Pa 2 hydropower plant is to supply partly electricity to Kbang district with annual average electricity production of 24.5 x 106 KWh • The project is expected to contribute to impulse for local economic and social development KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
ECO-SOCIAL CONDITIONS • In this area, mainly ethnic minorities of Ba Na, E De, etc live with low density. • Local life is poor, local inhabitants mainly earn their livings by husbandry and exploitation of forest products. Their life will be improved (by creating jobs, processing agricultural products, etc.) when the hydropower plant comes in. • The area owns convenient access road to the site. Road No. 669 A passes through powerhouse area and is 200 m far from the powerhouse. Access road to the dams is sloped gently along the riverside and convenient for construction. The distance from powerhouse to the dams is 2.5 km KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
LAYOUT OF HEADWORKS KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
MAIN FEATURES OF PROJECTCatchment parameters • Catchment area: 99 km2 • Annual average flow: 2.71 m3/s • Flood discharge P = 0.2%: 1,008 m3/s Flood discharge P = 1.0% 733 m3/s Flood discharge P = 5.0% 478 m3/s Flood discharge P = 10% 378 m3/s KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
MAIN FEATURES OF PROJECTReservoir parameters • Full Supply Level, FSL: 979.0 m • Minimum Operating Level, MOL: 977.5 m • Total storage capacity: 82.38 x 103 m3 • Active storage capacity: 61.31 x 103 m3 KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
MAIN FEATURES OF PROJECTDam and Spillway parameters DAM • Dam type: Concrete Gravity • Crest elevation: 985 m.a.s.l • Crest length: 85.83 m • Max height: 9.52 m SPILLWAY • Sill elevation: 979 m.a.s.l • Spillway Design Discharge: 1,008 m3/s • S KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
MAIN FEATURES OF PROJECTWaterway parameters INTAKE • Crest elevation: 985 m.a.s.l • Sill elevation: 975.48 m.a.s.l • Number of intake gates: (bxh) 1 unit (2x1.8) TUNNEL • Length: 2,420 m • Cross section dimension (bxh): 2 x 1.8 PENSTOCK • Inner Diameter: 1 m • Length: 824 m • I KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
CROSS SECTION OF POWER STATION KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
MAIN FEATURES OF PROJECTPower Station parameters • Install Capacity: 5.80 MW • Firm Capacity: 0.88 MW • Number of units: 2 units • Type of Turbine: Francis • Max Water Head: 267.96 m • Design Water Head: 249.90 m • Turbine Design Discharge: 2.80 m3/s KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
DESIGN WORK PROGRESS • Under Vietnamese standard, TCXD VN: 285 - 2002, based on the design parameters as FSL of 979 m, dam height of 9.52, and install capacity of 5.4 MW, the Krong Pa 2 hydropower project should be project at level III. • Based on the previous studies on topographic and geological conditions at project site, two alternatives 1&2 are compared to select the best dam site. • Alternatives of FSL will be either 978 m or 980 m, with daily regulation or non- regulation. Consideration for alternatives of install capacity and number of units. KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
Main Civil Work (1) KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
Main Civil Work (2) KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
INTERCONNECTION Current situation of power system in K'Bang district • At present, K’Bang is supplied electricity with 22kV network from feeder to K’Bang substation of 22 km length, AC-70 line. K’Bang substation owns three feeders of 22kV supplying electricity to the communes, including Dak Rong which supplied with electricity from feeder of 474 with the length of 40 km, AC-70 and AC-50 line. • Currently, P max of entire district reaches 2600kW . KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
INTERCONNECTIONPower system development plan up to 2020 in K'Bang district • Transformer of 110/35/22kV- 16MVA is planned to install in K’Bang. The transformer both supplies the district with electricity and transmits electricity from 13 MW-Ka Nak, 5.8 MW Krong Pa 2 hydropower stations to national power grid. It will meet the district’s power demand with electricity through 22 kV and 35 kV power network. • At Plan on PowerDevelopment of Gia Lai province period 2004-2010 perspectives up to 2015 prepared by Institute of Energy, Pmax is forecasted to reach 3610kW by 2005 and 5700kW by 2010 . KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
INTERCONNECTIONInterconnection plan for Krong Pa 2 project • From Krong Pa 2 hydropower project, the line goes along the road No. 699, passing through the communes of Dak Rong, Son Lang, So Pai, Xa Dong and K’Bang village to 110kV K’Bang transformer • The expecting line is about 55km, it will pass through the smoother area. Almost line is closed to the road, thus convenient for installation and operation. KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT • Physical environment. construction of KrongPa 2 hydropower project will give inconsiderable impact on physical environment. Reservoir bed does not cover any industrial minerals • Ecological environmentKrong Pa 2 hydropower project does not give any bad impact on ecological environment and gives insignificant ones on biological diversification. As the small reservoir, the impacts on surrounding are inconsiderable • Socio-economical situationAnnually, Krong Pa 2 hydropower project will supply national power grid with its electricity of 24.48 x 106 kWh /year, making significant contribution to socio-economic development. KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
CONSTRUCTION SHEDULE • Krong Pa 2 hydropower project is planned to construct within 2.5 years, 6 months among them will be spent for preparation. KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
TOTAL INVESTMENT CAPITAL Total investment cost (not including IDC) 100.58 billion VND of which: 1. Construction:52.72 bil. VND 2. Equipment: 31.10 bil. VND 3. Other cost: 7.62 bil. VND 4. Contingency: 9.14 bil. VND Total investment capital: 107.55 billions VND KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005
CONCLUSION • Based on calculations in the Fs it may be concluded that the proposed development of Krong Pa 2 Hydropower Project would be economically viable and friendly with environment. KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005