1 / 8

SPS Neutrino Facility Preliminary Proton Forecast

SPS Neutrino Facility Preliminary Proton Forecast. Rende Steerenberg with help from K. Cornelis , S. Cettour -Cave, B. Goddard. Combined FT – NF Super Cycle. Like todays super cycles FT – NF (Presently CNGS) 1 FT cycle of 15.6 sec. 4 or 5 cycles of 3.6 sec. in 6 sec. slots.

edith
Download Presentation

SPS Neutrino Facility Preliminary Proton Forecast

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPSNeutrino Facility Preliminary Proton Forecast Rende Steerenberg with help from K. Cornelis, S. Cettour-Cave, B. Goddard. ICARUS-NESSIE-CERN meeting

  2. Combined FT – NF Super Cycle • Like todays super cycles FT – NF (Presently CNGS) • 1 FT cycle of 15.6 sec. • 4 or 5 cycles of 3.6 sec. in 6 sec. slots. • 3.6 sec. NF cycles in 6 sec. slots for PS Complex physics users. • ISOLDE ratio day/night: 38% / 37%. • Combined operation not possible, as ZS needs to be retracted. • Super cycle used for comparison reasons. • NF would receive 3.76 x 1019 protons per run. ICARUS-NESSIE-CERN meeting

  3. Time Sharing Super Cycles for FT • Day time: • 2 FT cycles of 10.8 sec. • 2 MD cycles of 7.2 sec. • 2 ZERO cycles of 1.2 sec. • Max. rms current for SPS main circuits • Night time: • 2 FT cycles of 10.8 sec. • 6 ZERO cycles of 1.2 each • Max. rms current for SPS main circuits • ISOLDE ratio day/night: 44% / 33% ICARUS-NESSIE-CERN meeting

  4. Time Sharing Super Cycles for NF • Day time: • 5 NF cycles of 3.6 sec. in 6 sec. slots. • 1 MD cycles of 7.2 sec. • Night time: • 6 NF cycles of 3.6 sec. in 6 sec. slots. • ISOLDE ratio day/night: 35% / 33% ICARUS-NESSIE-CERN meeting

  5. Proton Forecast With Time Sharing • Run assumptions: • 3.5 x 1013 protons per SPS pulse (Presently limited by PS extraction flux and radiation dose rate) • Transverse emittances compatible with extraction (remains to be confirmed) • Physics run of 200 days shared between FT and NF. • 75% accumulated SPS beam availability. • No FT and NF physics during LHC filling (4 hours per 24 hours). • If NF would run at 60% then FT receives same number of protons as today. • 2.85 x 1019 protons per run (50% would results in 2.37 x 1019 protons per run). • If NF would run at 75% then FT received same number of pulses as today. • 3.56 x 1019 protons per run. • However, • Many different NA users, today’s schedule is full  50% - 60% NF is realistic, but shorter runs. • Experimental switching to be synchronized with NA off periods. ICARUS-NESSIE-CERN meeting

  6. Beam Power Estimates • Normal running: • 3.5x1013ppp every 6 sec. • Beam energy 110 GeV • Beam power: 100 kW (during NF run period) • Ultimate running: • 4.5x1013ppp every 3.6 sec. • Beam energy 120 GeV • Beam power: 240 kW (during NF run period) ICARUS-NESSIE-CERN meeting

  7. ICARUS-NESSIE request vs. delivery potential • Protons request: • 4.5 x 1019 protons per year for neutrino mode. • 9 x 1019 protons per year for anti-neutrino mode. • 1.35 x 1020 protons in total in 3 years. • 4.5 x 1019 protons per year. • Potential proton delivery: • ~ 2.85 x 1019 protons per years (60% time for NF). • Approximate duration is 4.7 runs of 200 days. ICARUS-NESSIE-CERN meeting

  8. Summary / Conclusion • Combined running not possible, unless considerable structural changes to SPS lattice are made. • ZS (NS electrostatic slow extraction septum) to be retracted during NF runs. • 3.6 sec. NF cycle in 6 sec. time slot required for PS complex physics. • Realistic time sharing: • 50% - 60% for NF  2.85 x 1019 p/yr. • Nominal NF Beam Power ~ 100 kW (limited by PS extraction). • Equal or slightly more pulses and protons for NA • Shorter runs per test beam and synchronized experimental switching required. • Make careful choices to allocate experiments to SPS-NA and PS-EA. • About weekly based time sharing is probably most efficient. • ISOLDE on average at 35% (today 37%) (sharing ISOLDE, nTOF and EA contain some flexibility) • Design of neutrino facility should be based on the ultimate beam power of 240 kW at 120 GeV. • Required amount of protons could be delivered in 4.7 runs of 200 days each. • Several things remain to be confirmed to consolidate the present preliminary estimate. • Final extraction • Beam line • Transverse emittances • Beam losses ICARUS-NESSIE-CERN meeting