30 likes | 192 Views
Anode Power Supply Status. 6/25/2014. Schedule. Possible Delays. Capacitors 1 st shipment should have been delivered alreay No update from factory Step Start Cabinet Still awaiting approval drawings Enclosure Still working through small details MOVs 6-8 week lead time PCB
E N D
Anode Power Supply Status 6/25/2014
Possible Delays • Capacitors • 1st shipment should have been delivered alreay • No update from factory • Step Start Cabinet • Still awaiting approval drawings • Enclosure • Still working through small details • MOVs • 6-8 week lead time • PCB • Large Format or many smaller boards