An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cross Functional Team to Resolve Seat Track Alignment Issue Seat Track Tiger TeamJuly 2011Kyle Starck / Matt Berden

  2. Mitigation of Non-Conforming Conditions Conditions Proposal | Tech Study 476 – investigate correlation between partner & cell 10 align

  3. Movement from Cell 10 to Cell 20 • Proposal • Move seat track join back to Cell 10 • Status • Workshop performed to evaluate feasibility – Complete • Process tested on LN 49, 50 • Opportunity to complete LN 54 & 55 before they leave Cell 10 • LN 56 will be first official start • Opportunities • Allows baseline jobs to be transferred into Cell 20 from Cell 30 • Seat track join no longer keeps everyone off the fuselage in Cell 20 • Help Needed • None Starting on LN 56 seat track joined in Cell 10

  4. Engineering Allowances • Proposal • Increase tolerance for WL & BL from +/- .030 • Status • Stress has approved change • +/- .050 Lateral deflection • +/- .100 Vertical deflection • CR going to CCB3 this week • Establish implementation for LN 57 • Help Needed • None Stress approves tolerance increase during integration

  5. Section 11/45 Section 43 Barrel Alignment in Cell 10 • Proposal • Implement automated laser measurement of seat tracks • Provide alignment team with the ability to receive instant feedback on seat track location • Status • Initial automation programming of the laser tracker complete – Barry Cooke • Test runs completed on LN 53 & 54 • Programming revision to provide production friendly interface (No CAMS) – In work • Implement in production on LN 56 • Help Needed • None Implement on LN 56

  6. OOT Seat Tracks Provided by Partners • Proposal • Improve partners’ build process • Status • Hardware Variation Summit – 4/18/11 • Weekly WebEx • Measurements throughout process - Complete • Trip to KHI (organized by LCPT) – Cancelled • Process improvement – None • Help Needed • Complain on a Leadership level about seat tracks provided by KHI • KHI refuses to implement tolerances for aft end of seat tracks • Send BSC team to KHI to explain deficiencies in process BSC team needs to go to KHI

  7. KHI Process Deficiencies • Floor beams not tool located in seat track Assy Jig • Floor beams hung from the seat tracks without any shimming • Floor Grid moved and loaded on cart which allows racking, flexing, and sagging • Coordinating alignment holes on the frame fitting and floor beam fitting • Enormous tolerance build up between seat tracks and ABC datum holes • ABC Datum holes to frame datum hole (Barrel shape, skin profile) • Frame datum hole to frame fitting datum hole (hole location, warping of frame) • Frame fitting datum hole to alignment hole (interface betwee • Alignment hole to floor beam fitting datum hole • Floor beam fitting datum hole to seat track hole (Class 3) • Seat track hole (Class 3) to end of seat track • No adjustment made by KHI while loading the floor grid in the barrel • No reference from the seat tracks to the ABD datums BSC team needs to go to KHI