Strategy for long-term support of the TTC system

Strategy for long-term support of the TTC system. 7 th July 2005. Brief status TTC upgrade principle AB/RF and experiment conditions Implementation proposal Proposed procedure. Initial Scheme. Present Scheme. RF transmitters. 3 or 6 fibres needed (5 compensated only). RF receivers.

effie
Download Presentation

Strategy for long-term support of the TTC system

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Strategy for long-term support of the TTC system 7th July 2005 LECC / Sophie BARON-PH/ESS

  2. Brief statusTTC upgrade principle AB/RF and experiment conditions Implementation proposalProposed procedure LECC / Sophie BARON-PH/ESS

  3. Initial Scheme Present Scheme RF transmitters 3 or 6 fibres needed (5 compensated only) RF receivers • 4 crates: • 1 TTC • 1 TTC/SPS • 1 TTC spare • 1 BST • 4 crates: • 1 TTC ring 1 • 1 TTC ring 2 • 1 TTC ref? • 1 TTC spare Encoded BC & Orbit 1 + spare 2/3 + spare TTC status • Backbone: from SR4 to the experiments LECC / Sophie BARON-PH/ESS

  4. TTC system status • The TTC transmission crates (in CCC) are obsolete • Only 4 crates • 3 BC and Orbit to be transmitted => ONE SPARE • Some lasers are ageing… • …and are obsolete as some other components • Some schematics are missing • Same problem for the receiving crates in experiments and labs • Only 12 crates, and also getting obsolete • 3 TTCmi needed per experiment => NO SPARE • We are crucially missing remote monitoring LECC / Sophie BARON-PH/ESS

  5. Brief status TTC upgrade principle AB/RF and experiment conditions Implementation proposalProposed procedure LECC / Sophie BARON-PH/ESS

  6. AB/RF transmitters Optical links AB/RF receivers New Receiver crate TTC backbone: proposal from AB/RF • Extension of the AB/RF optical transmission link AB/RF transmitters Optical links AB/RF receivers TTC transmitter crates • Advantages: • Only one design to be done on the PH/TTC side to replace the TTCmi • On-call support ensured by the AB/RF piquet team • To be compared to a simple redesign of the system: • 2 modules to be designed (transmitter crate + TTCmi) • Nobody in PH for the on-call support on the TTC transmitter crates (a piquet service is 6 people) Optical links TTCmi LECC / Sophie BARON-PH/ESS

  7. Upgrade of the TTCmi To be specified with the experiments: • Receive the 3 BC and Frev from the AB/RF optical receivers (sinusoidal signals) • Convert them into a logic standard (LVDS or LVPECL) • Clean the BC signals with a PLL • Stretch the Frev to the desired length and synchronize it to the BC • Provide a stand alone frequency when the BCs are not provided by the RF (mostly outside physics). To achieve this aim, 2 solutions are possible: • Machine timing events with • the BST system from AB/BDI, or • the GMT system from AB/CO, or • provide a fake BC out of the physics period (after beam dump and before beam injection) • Detect the missing clock (out of locking range) and provide a fake BC if necessary • Fan out the BCs and the Orbit • Monitor signal quality (PLL lock, orbit presence, ..) via VME • Control the phase of the recovered BC, as well as the phase of the incoming orbit via VME • … => performances must be equal or better than current TTCmi crate Philippe Baudrenghien AB/RF

  8. Brief status TTC upgrade principle AB/RF and experiment conditionsImplementation proposalProposed procedure LECC / Sophie BARON-PH/ESS

  9. AB/RF & Experiment conditions LECC / Sophie BARON-PH/ESS

  10. Brief status TTC upgrade principle AB/RF and experiment conditions Practical ImplementationProposed procedure LECC / Sophie BARON-PH/ESS

  11. Practical implementation • AB/RF equipment • Tx/rx pair: a priori, the Miteq 3GHz LBL fibre optical link has been evaluated • Measured jitter for 8km of buried fibre: 1 ps pk-pk => do not add any extra jitter • Optical power = 6 dBm (4 mW) • 5000 Euros (7770 CHF) per tx/rx pair • Fibre routing • Experiments are in favour of the “tunnel” scheme (to avoid thermal drift), but… • Chosen scheme will be linked to the radiation level and the tx power budget LECC / Sophie BARON-PH/ESS

  12. Practical implementation • New receiver crate – replacing the TTCmi RF2TTC converter module: converts, cleans, synchronizes, selects and transmits the BC and Orbit to the trigger electronics of the experiments • 2 AB/RF receiver modules (each one equipped with 2 optical receivers) • 1 spare? (used for extra orbits) VME 6U crate with a standard VME64 backplane If the GMT solution is chosen: CTRP mezzanine from AB/CO BOBR module if the BST solution is chosen Electrical fanout Crate Controller Max: 5/6 modules per crate, including the crate controller LECC / Sophie BARON-PH/ESS

  13. Practical implementation • Support organisation: • AB/RF will be responsible for: • The maintenance and the support of their equipment • Spares policy to be defined in collaboration with them • The piquet needs to have access to this equipment • Remotely by ethernet • Physically to exchange the modules Special case of ALICE (no access during runs) to be solved • PH/ESS will be responsible for: • The design, maintenance and off-line support of the new VME modules • The software for AB/RF and new reception modules interface • The support of the RD12 - TTC transmitter crates in CCC • The maintenance (with the stock of obsolete components we have in Bruce’s cupboard) of the RD12 - TTC equipment • Experiments will be responsible for: • The on-line support on the new receiver crate – except the AB/RF modules LECC / Sophie BARON-PH/ESS

  14. Practical implementation • responsibilities LECC / Sophie BARON-PH/ESS

  15. Practical implementation WHO PAYS? • Price: first estimation per experiment UPGRADE WITH AB/RF Tx/Rx BASIC UPGRADE LECC / Sophie BARON-PH/ESS

  16. Brief status TTC upgrade principle AB/RF and experiment conditions Practical ImplementationProposed procedure LECC / Sophie BARON-PH/ESS

  17. Approval in principle Agreement of experiments on the document Agreement of the AB/RF Formal signature (EDMS) Procedure • Specifications of new reception module in collaboration with the experiments • Design – autumn 05 • To be tested during the structured test beam in September 2006 • The software to be written in parallel (M. JOOS) • The current system will be back in place as soon as the CCC is available • Maintained for the structured test beam in parallel to the new system • Compatibility with current AB/RF scheme to be ensured for the LHC start • Will be running in parallel to the new system until its complete validation LECC / Sophie BARON-PH/ESS