1 / 8

Production Status of Silicon for the Spectrometer

Production Status of Silicon for the Spectrometer. 80% of silicon for 1 arm finished production yield 60%. Production Status of Hybrid Components. All components for 1 arm produced 50% spare components available assembly losses <10%. Status of hybrid and module assembly.

efrenk
Download Presentation

Production Status of Silicon for the Spectrometer

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production Status of Silicon for the Spectrometer 80% of silicon for 1 arm finished production yield 60%

  2. Production Status of Hybrid Components All components for 1 arm produced 50% spare components available assembly losses <10%

  3. Status of hybrid and module assembly

  4. Status of hybrid assembly Chips and substrate testing finished 57 % of needed hybrids assembled with chips and bonded

  5. Status of Module assembly 40% of modules assembled test of these modules is currently in progress

  6. Assembly Time Schedule

  7. Calibration test verify basic functionality determine the gain of the module find dead or substandard channels Acceptance criteria = less than 5% dead channels Test with 90Srsource: verify sensor function verify signal measure signal/noise distribution Acceptance criteria = peak signal/noise > 10 Test of Modules

  8. Summary page for module tests All tested modules fulfill specification Typical measure S/N=16:1