An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MOM Report October 9- Now Linda R. Coney UCR

  2. October 15thRunning • Target • Beamline Magnets • Detectors? • Could not turn on • HV supply in hall off • HV supply crashed • Target DAQ • DAQ? • Could not run w/o detectors on • Was NOT working • Caused major problem Saturday

  3. October 18th Running Dosimeter arrays: Single dosimeter mounted on the exit window of the decay solenoid; Array of dosimeters on the inside the DSA north wall; Array of dosimeters on the inside of the DSA west wall; Array of dosimeters on the upstream surface of the fixed radiation-shield wall.

  4. Goal1: Study beam loss and particle rate as fxn of target dip depth Goal2: Install dosimeters in DSA and Hall Results:October 18thRunning 19:20 Target actuations start. Time Loss setting GVA1 GVA2 Counts 19:34 1 5786 1231 12045 19:41 2 6468 1087 10243 19:47 3 11755 1244 10550 19:58 3 (repeat) 10451 1156 10146 20:03 4 13808 3607 10201 20:07 5 16508 1494 10393 20:13 6 22085 1870 11875

  5. Issues: October 18th Running • DAQ not working when start running • GVA2 disconnected – • had to debug/discover/reconnect/power up • Target delay adjustment – caused target dipping to stop • Had to debug – 1.5 hr delay

  6. October 19thRunning • Goal: Measure change in activation of synchrotron with MICE target operating at MS/128 and producing beam loss at the 200 mV level for a period of sixteen hours. • Dosimeter arrays installed • “Pre-run” rad survey done • Turned on magnets, target, detectors, target DAQ, DAQ

  7. Results: October 19th Running • New Target DAQ info • ISIS beam intensity, Total Beam Loss • Sector 7, Sector 8

  8. Results: October 19th Running • New Target DAQ info • ISIS beam intensity, Total Beam Loss • Sector 7, Sector 8

  9. Results: October 19th Running • NO issues getting started/running!! • Startup ~ 1 hour • Took data all day – 14 hours • Many shifters • Detectors and DAQ running • scanned beam momentum in steps of 20 MeV/c from 100 MeV/c – 400 MeV/c • 19, 658 target actuations

  10. General ToDo List • ELOG running and being used* • Install dosimeter arrays in/around DSA and hall – done, will stay until user run begins • Establish routine monitoring points in hall with Charlie East – pending • Need local time server in MLCR – JSG • Need dedicated Windows machine in MLCR in order to change target delay – KL sorted out • Target DAQ integrated into DAQ – pending

  11. General ToDo List Cont’d • Decay Solenoid Fridge – Linde worked on fridge to fix recent problems • fit the pressure reducer and clean the gas after the blockage experienced in the last cool down • May still be leak - investigating • North wall finished by Nov 14 • Dust/dirt in hall on/near power supplies still an issue • need professional cleaning • PPS – installing yellow cage doors next to MLCR, mezzanines

  12. Shutdown ToDo List • Open up Decay Solenoid and install more diagnostics - done • Fix Q4,Q5, Q6 water leaks - done • Moveable beam stop in place/test – done & working • Concrete floor block started – finished • FNAL beam monitors • Small one rebuilt, noise problem fixed, reinstalled behind DS, and running • almost done • Large one - pending • Reinstall GVA1, GVA2 – done • Recover from power outage – done • Commissioning runs on CKOV – ongoing (Dan?)

  13. Documentation • Need for standard procedural and for troubleshooting • Target • Beamline magnets • Decay solenoid/fridge • Detectors • Target DAQ • DAQ • ELOG - works

  14. Other Useful Changes • Phones in MICE corral in R76 dial internationally • New MICE visitors webpage • Maps, instructions for first visit, safety training information, travel and transport info, local restaurant and lodging info • Shipped 6 VLSB, 7 AFEIIt spare boards to FNAL (Terry comment) • New MICE digital camera • Facilitate trouble shooting/documentation/recording actions • Start overall contact list ** • MICE van CAN be parked overnight at Cosener’s House • Have established procedure for obtaining permission to drive van • Must be more formal than previously thought

  15. Future Commissioning Needs • Standardize MOM handoff • Wrote document for transition from my term to Dan • MOM handoff information • Hall search and secure procedure • Daily walkthrough procedure • Prepare for running procedure • ToDo list as of end of current MOM term • List of contact people for ongoing, high priority projects • Should be edited/added to as needed • Documentation • MUST document everything given few experts and many shifters • MUST use/read ELOG Exercise equipment regularly – whether taking beam data or not

  16. Future Commissioning Needs • Exercise equipment regularly – whether taking beam data or not • Formalize run training like safety training? • “certified” to turn on magnets, dip target, run DAQ • Review previous run periods • How improve efficiency & productivity • What went wrong – how avoid next time • Like M&M for med school (morbidity & mortality) • Run review panel?