110 likes | 478 Views
API 17N Subsea Production System Reliability and Technical Risk Management. Don Wells Hess Corporation. History / Status. Document released in 2009 Specificatio n contains: Life Cycle Process ( LCP ) Define, Plan, Implement, Feedback ( DPIF ) Loop 12 Key Practices ( KP )
E N D
API 17NSubsea Production System Reliability and Technical Risk Management Don Wells Hess Corporation
History / Status • Document released in 2009 • Specification contains: • Life Cycle Process (LCP) • Define, Plan, Implement, Feedback (DPIF) Loop • 12 Key Practices (KP) • Technology Qualification Process • Technology Readiness Level
Why Change? • BSEE Wants: • Prevent Prescriptive Standards • Self-regulation by the Industry • Issues with 17N: • Operational Goals & Requirements • Unbalanced Life Cycle Processes • Technology Readiness Level Use & Implementation
Plan / Path Forward • Process • Split into 5 subgroups • Industry Leaders • Common Template • Introduce IM into the scope of 17N: • Define IM • Expand the Life Cycle Processes • Reassessment through remediation • Define TRL progression
Detail • Expand the LCP • Provides balance and depth to the document • Communication of goals & requirements
Detail • Change to a Dual-DPIF Loop • Define – Plan – Implement - Feedback • Add Remediation cycle • Facilitates Integrity Management
Detail • Change to a Dual-DPIF loop • Add Remediation cycle • Facilitates Integrity Management
Next • Remaining challenges: • Incorporating Human Factors • Decommissioning (Well Abandonment) • Document Matrix • Technology Qualification Appendix • 17N is currently in first edition drafting • Final Draft Review late-Q2 2013 • Peer & Industry Review Q3 2013 • Submittal Planned Q4 2013