E N D
1. NATO Danisma, Komuta ve Kontrol Ajansi-NC3ANC3A Semineri 2009 ANKARA, 11 Mayis 2009
3. NATO Restricted 3
4. Coherence through NATO business processes
8. TMD C2 Capability Area Roadmap
9. C4I(SR) Capabilities
11. Joint Intelligence Surveillance and Reconnaissance (JISR)
Lillian Rossini, Chief CAT 5
12. JISR Support to Current Operations ISAF
JISR Step 1/FMV Distribution
Kandahar ATC
C-IED
KAF Perimeter Force Protection (Sense and Warn)
CCIRM
Intelligence Tools/Analyst Support/Databases
Biometrics and access control
13. JISR Opportunities in 2009 Intel Toolbox for ISAF
2Q2009
Intel Functional Services
2Q2009
Spectrum management and direction finding
3Q2009
Mobile vehicle screening for KAF
2Q2009 (BOA)
KAF Perimeter Defence
2Q2009
ISAF Access System/Biometrics
2Q2009 (phase 1 – mitigation strategy)
4Q2009 (forecast IOC rollout)
14. CAT 5: Joint Intelligence Surveillance & ReconnaissanceKey Project: NATO Intel Toolbox on Mission Secret Aim of the Project:
- Deploy dedicated Intel hardware throughout ISAF
- Deploy Intel capability at Regional Commands
- Integrate Intel data with nations through CSD & BICES
- Support proliferation of MAJIIC capabilities in ISAF
- Provide cross-domain capability between NS & IS
Sponsor: SHAPE CMD / ISAF
Project ID: 2008/5VA30489 (USOR J2 011)
Target dates: (anticipated)
- IC Approval: 24 March 2009
- IFB Release: Mid May 2009
- Contract Award: Late July 2009
Industrial Opportunities:
- Hardware procurement, installation and support
- Software development & support
Related Projects:
- ISAF FMV DSAR Capability (2008/5VA30479)
- INTEL FS (2005/0IS03063)
15. Intelligence Functional Services (INTEL-FS)Spiral I
16. Intelligence Functional Services (INTEL-FS) Spiral I Acquisition strategy
Single tender for INTEL-FS Spiral I capability
Current Invitation for Bid focus
Delivery and support of initial increment capability
Requirements analysis/design for next increment
‘Best value’ evaluation
Follow-on increments to same Contractor assuming successful delivery and agreement on cost/scope
Status
Request for Bidders’ Views process completed in Aug 2008
Stakeholder community revalidated functional priorities 4Q08
Expected near-term schedule
Invitation for Bid Release – 2Q09
Bidders’ Conference – IFB Release + ~3 weeks
Contract Award – 4Q09
Interested? Contact:
National Delegation and
NC3A Contracting Officer: Mr Martin Steenwege
martin.steenwege@nc3a.nato.int,
Tel: +32-2-707-8173
17. CAT 5 Spectrum management and direction finding
Aim of the Project:
Acquire and deploy an sensor architecture to monitor the radio frequency spectrum and locate sources of interference
Sources are primarily self (ISAF) generated
Provide RadHaz monitoring
Scope:
Theatre-wide (initially Kabul area)
18. CAT 5 Enhance Force Protection Kandahar Air Field
Aim of the Project:
Provide enhancement for Kandahar Integrated Perimeter security (2 converging paths)
Path 1: Acquire FP systems like a suite of radars, cameras and integration systems to provide early warning of perimeter intrusion and rocket / mortar attacks on KAF
Path 2: Provide integrated Command and Control solution in Joint Defense Operation Cell (JDOC)
Sponsor:
- Infrastructure Committee, SHAPE
Schedule (tentative):
Invitation For Bids: 2Q09
Initial Operational Capability: 3Q10
Full Operational Capability: 4Q11
19. ISAF TACTIC – Theatre Access Control & Threat Identification Capability
Aim of the Project (Provide ISAF):
High security ID card.
Real-time access control with ID card electronic verification.
Biometric data collection of grey/red forces with integration to access control grey force entry checks.
Comparison of lifted latent prints from threatening events such as IED’s to the consolidated biometric repository.
NATO Central Nexus of Threat Alerts (e.g. consolidated biometric data – NATO Ops) to provide alerts from outside of ISAF Theatre.
20. Integration Support and Value Added Services
Dr. Levent Mollamustafaoglu, Acting Chief CAT 6
21.
Logistics Services (LOG-FS)
Situational Awareness (JCOP/NCOP)
Geospatial Services (Core GIS)
23. LOG FS Capability Package NAFS: NATO Automated Financial System
NDSS: NATO Depot and Support System
MEDICS: Medical Information and Coordination System
SDM: Supply Distribution Model
NRF ARMS: NATO Response Force Ammunition Requirments Mediation System
OLCM: Operations Logistics Chain Management
NAFS: NATO Automated Financial System
NDSS: NATO Depot and Support System
MEDICS: Medical Information and Coordination System
SDM: Supply Distribution Model
NRF ARMS: NATO Response Force Ammunition Requirments Mediation System
OLCM: Operations Logistics Chain Management
24. JCOP Requirement Background NATO is in urgent need for a Joint Situational Awareness capability
Programs in place (NCOP) do not deliver before 2010 (has now become mid 2011…)
Basis for DSACEUR’s request for an Interim JCOP Capability (May/June 2006)
25. Overall COP Roadmap
26. Core GIS
28. CAT7: Core Enterprise Services Support integration of ‘cradle to grave’
Capability
Identify capabilities required to fulfil strategic missions
Translate these capabilities in terms of requirements
Develop and assess operational solutions to fulfil these requirements
OA analysts (applied OA, problem focused, developing / applying methodologies and using analytical support tools;
IKM – KFOR, EUFOR, ISAF, NATO/Alliance JOCsSupport integration of ‘cradle to grave’
Capability
Identify capabilities required to fulfil strategic missions
Translate these capabilities in terms of requirements
Develop and assess operational solutions to fulfil these requirements
OA analysts (applied OA, problem focused, developing / applying methodologies and using analytical support tools;
IKM – KFOR, EUFOR, ISAF, NATO/Alliance JOCs
29. NNEC Capability Areas
30. Migration to an Enterprise Architecture & provision of EMS enhancements Goals and Objectives
Complete the migration to the NATO SECRET Windows Forest/Domain structure
Upgrades to the NCSA Enterprise management Capability
Sites covered
Most of the NATO Command Structure
Project activities
Migration of the current complex Windows multiple domain structure into a single Windows 2003 AD Forest containing one Domain with multiple Organisational Units
Implementation of secure diode solutions for transfer of management information from NU to NS (possibly using clustered pairs at 5 major locations)
INFOSEC accreditation support
Timeframe
Release of RFQ: 2nd Quarter 09.
Project implementation: starting 4th Quarter 09
31. IT Consolidation Goals and Objectives
To identify and quantify the expected benefits and disadvantages of consolidation of IT processing and service support within the NATO Command structure
Sites covered
All
Project activities
Determining the feasibility of consolidation of the Bi-SC AIS infrastructure and the associated O&M support services
Assessing the impact of consolidation on the NATO communications infrastructure
Developing possible high level system designs for consolidation, including geographical recommendations
Providing a business case for (or against) consolidation
Timeframe
Release of RFQ: 3rd quarter 09
Project implementation: starting 4th quarter 09, duration approx 6 months
32. Balkans CIS Outsourcing Goals and Objectives
To replace the current 4 support service contracts (covering support of the AIS, CIS and SATCOM) at seven sites in the Balkans. This will be a single, outsourced, SLA based support contract.
One year initial contract with optional one year extensions.
Sites covered
EUFOR/NHQSa and KFOR AOR
Project activities / Timelines
Release of IFB: 2Q09
Contract Award: 3Q09
Project implementation: starting 3Q09, duration of implementation approx 6 months
33. New NATO HQ Building This aerial plan shows the main building, the gate areas at the North (far upper left) and South (upper right) entrances, the Staff Centre and the Industrial Infrastructure at the upper left
The larger parking area is here in the SW corner, with another somewhat smaller parking area to the East.
This aerial plan shows the main building, the gate areas at the North (far upper left) and South (upper right) entrances, the Staff Centre and the Industrial Infrastructure at the upper left
The larger parking area is here in the SW corner, with another somewhat smaller parking area to the East.
34.
Start Physical Building Process Feb 2010
Final TBCE to WGNTE Jun 2010
CBC Authorisation Dec 2010
Release IFB Dec 2011
Contract Award Jan 2013
Start Implementation (49 months after 1) Mar 2014
Implementation Ended (65 months after 1) Mid 2015 Active Network Procurement Phase
35. Tasker Tracker Enterprise (TTE) Installation and Support Goals and Objectives
Install and train the industrialized version of Tasker Tracker on the current Document Handling System (DHS)
Sites covered
Bi-SC AIS Commands in Belgium, Denmark, Germany, Greece, Italy, Netherlands, Norway, Poland, Portugal, Spain, Turkey, UK, US, and possibly ISAF and KFOR
Project activities
Participate in application testing at NCSA with the industrialization Contractor - MCS
Perform sites Installation
Provide on site training
Provide TTE application and MOSS 2007 support via a manned Help Desk in Mons, Belgium
Timeframe
NOI released end Feb and RFQ release: April ‘09.
Project implementation: 4Q09-2Q102009. MCS = Microsoft Consulting Services Belgium
See CAT 7 KMT portal page for executive information paper on TTEMCS = Microsoft Consulting Services Belgium
See CAT 7 KMT portal page for executive information paper on TTE
36. NATO Information Portal (NIP) Increment 1 Goals and Objectives
Provide foundation concepts, support and initial implementation of the NIP
Sites covered
Bi-SC AIS Commands in Belgium, Germany, Italy, Netherlands, Norway, Poland, Portugal, Spain, Turkey, UK, US
Project activities
Define and document NATO Command XML schema and taxonomy
Demonstrate XML schema definition as sample templates
Provide and train on taxonomy tool and provide backward tracing to legacy taxonomy
Define NATO Portal Business Process
Install and configure NIP on MOSS 2007 in Belgium, Italy, Netherlands, Portugal & US
Timeframe
Release of BOA – 3Q09
Release of NOI 2Q09 and ICB 3Q09
Project implementation: 2010. ICB - Define NATO Command XML schema and taxonomy, with
BOA – define NATO Portal Business Process
See CAT 7 KMT portal page for executive information paper on NIP
ICB - Define NATO Command XML schema and taxonomy, with
BOA – define NATO Portal Business Process
See CAT 7 KMT portal page for executive information paper on NIP
37. Bi-SC Record Management and Archive Capability upgrade Goals and Objectives
Upgrade the existing Document Handling System (DHS) Record Centre’s Records Management and Archive capabilities based on the to be approved (3/4Q09) updated NATO policies and Bi-SC Directives
Sites covered
Bi-SC AIS Commands in Belgium, Germany, Italy, Netherlands, Norway, Poland, Portugal, Spain, Turkey, UK, US, and possibly ISAF and KFOR
Project activities
System design and process documentation
Software and workflow development
System installation
Training
Timeframe
2010-2011. Future project that we are trying initiate via DSA NIP and SACT. In CP 150 it is and enhancement to the EDMS.Future project that we are trying initiate via DSA NIP and SACT. In CP 150 it is and enhancement to the EDMS.
38. Upgrade of the Informal Email System in CRO Sites Goals and Objectives
Upgrade the current Exchange 5.5/2003 system to Exchange 2007
Sites covered
KFOR sites, SFOR sites, Iraq sites.
Project activities
Reuse of the existing system design (PFE)
Procurement of HW and SW (including Exchange 2007, Backup solution, Archiving solution)
Sites Installation
Migration from current Exchange 5.5/2003 setup to Exchange 2007
Provision of Training
Timeframe
Release of RFQ: mid-09.
Project implementation: 2010.
39. NATO Enterprise Directory Service Goals and Objectives
Implement a Metadirectory capability to synchronise between the various NATO directories (including ActiveDirectory), and interoperability with the Nations through the Alliance Replication Hub.
Sites covered
SHAPE (Mons), JFC-Brunssum
Project activities
System design
Procurement of HW and SW,
Installation in the two sites, with interfaces to a range of NATO directories
Training
Timeframe
Release of RFQ: mid-09
Project implementation: end 2010 – early 2011.
40. NATO Metadata Registry/Repository Goals and Objectives
Implement a Metadata Registry/Repository to offer services a discovery mechanism to find XML artifacts (XML, XML Schema, RDF, OWL) and to implement configuration management and control of these artifacts
Sites covered
TBD
Project activities
System design
Procurement of HW and SW,
System installation
Training
Timeframe
2010-2011.
41. Information Assurance&Service ControlCapability Area Team CAT- 8 Bernard Roussely
Information Assurance & Service Control Team [CAT- 8]
42. CD: NCIRC Full Operational Capability CP155 - 2005/0IS03004 : Provide NATO NCIRC FOC
Provide the Full Operational Capability (FOC) required to respond to CIS-related security threats by expanding on the NCIRC Initial Operational Capability
The amount currently programmed will now only constitute a Phase 1 of the NCIRC FOC
Programming of Phase 2 to fully realise the FOC (SOR) is planned through a Bi-SC – NCIRC T1 / T2 addendum currently under development
Only Design part of Phase 1 (Step 1) authorized by IC end of last year (NSP000920)
43. CD: Bi-SC AIS Security Alignment Project Phase 1 of this project will deploy
N-IDS to protect the NU and NS User Domain of 22 NATO sites
H-IDS to protect Critical servers located in the User Domain of 22 NATO sites
An upgrade of the Centralised Management Infrastructure managed by the Computer Incident Response Capability (NCIRC) Tier 2 in SHAPE, Mons
44. CD: Research and Development Cyber Defence main activities
Improved Cyber Defence visualisation (NCIRC FOC Phase 2)
Dynamic Risk Management Data Model (NCIRC FOC Phase 2)
Active Content Removal capability
Remote Data Aggregation Capability
45. Potential technology transferto Industry Cross Domain Information Assurance
Evaluation by SECAN of the NC3A XML-Labelling Guard has been initiated
Evaluation report expected 3Q09
XML-Labelling Guard to be integrated into the IEG Scenario C architecture during CWID 09
46. Information Assurance Implementation Plan
47. Status (1/7) 0CM03039 : Provide NATO On-Line Cryptographic Equipment
Acquisition, implementation and support of NATO on-line cryptographic equipment including NATO Secure ISDN Encryption PRI and NSIE BRI, DISBEE (i.e., link crypto), Secure Portable Communicators (SPC).
Initial overall cost estimated to 31.197.364€, 433 DISBEE, 450 PRI, 688 BRI, 1800 SPC
48. Status (2/7) 0CM03039 : Provide NATO On-Line Cryptographic Equipment
NSP002585 : Secure Portable Communicators
The project will provide SPC devices for secure mobile telephony and for secure mobile applications (email, web, …)
Initial scope for approx 1800 devices then adjusted to 943 NS and 1279 NR devices in the SOR
Gateways require integration with the core services both at the NR and NS levels
49. Status (3/7) 0CM03040 : Provide NATO Off-Line Cryptographic Equipment
Phase 1 will procure
3,943 NU/NR, 1274 NS/MS and 45 CTS hard disk encryption devices and
5730 NU/NR and 602 NS USB encryption devices
Phase 2 will procure
445 off-line encryption units for all classification levels to replace existing RACE / AEROFLEX units and
2385 file encryption licenses/devices for NU/NR
NSP000919 phase 2: Estimated value : 1.5M€
50. Status (4/7) 2005/0IS03067 : Provide NATO Electronic Key Management System (NEKMS)
Acquisition of 649 Next Generation Electronic Fill Devices (EFD) was reviewed by the Working Group of National Technical Experts in April 2008 and authorised the Infrastructure Committee in October 2008
Security and Operational evaluation is on-going in 2009 and contract award is expected by late 2009, with deliveries in 2010 and 2011
NSP000918 : Provide NEKMS Phase 1 (EFD procurement)
Acquisition of Local Key Management units will be considered in late 2009 or 2010 if required by NCSA
51. Status (5/7) 0IS03069 : Provide NATO Secure Information Exchange Interfaces (NSII)
This project will provide for the central management of the security mechanisms required to protect Information Exchange Gateways (IEG) that interface NATO and national/non-NATO international organisations/public networks Command and Control and Information Systems
SOR still to be defined
0IS03070 : Provide NATO INFOSEC Management (NIM)
This project will provide the systems and tools required to provide an integrated and effective management of all INFOSEC services, mechanisms and devices. It includes labelling, risk assessment, certifications and accreditation, security configuration management, auditing, etc.
SOR initiated by ACO J6 but to be coordinated with ACT and NSAB / NSRAG regarding the “CIS support to the Accreditation process” part
52. Status (6/7) 0IS03071 : Provide NATO INFOSEC Support
This project will provide for the INFOSEC upgrades to NATO CIS Reference Systems and Evaluation Testbeds, core elements of a Cryptographic Evaluation Facility and an EMSEC capability at NCSA
Complete SOR ready to be approved
53. Status (7/7) 0IS03072 : Provide NATO Public Key Infrastructure
This project will provide for the acquisition, implementation of the infrastructure aspects of the NATO Public Key Infrastructure (NPKI) including assets required to set up a Certification Authority and about 65 Registration Authorities NATO wide in support of the Bi-SC AIS
It will not cater for the integration of the NPKI certificate services within end-user applications.
SOR finalised by ACO and to be signed off by ACT in Feb 09
54. NII Communication Infrastructure Services-CAT 9
Malcolm Green, Chief CAT 9
55. CAT9 Area Activity
56. CAT 9 2009 Portfolio Values (Investment)
57. MAIN THEMES FOR 2009 - 2012 Service Convergence on IP
Migration to IPv6 and challenges of co-existence
End-2-End application level QoS to ensure mission critical traffic is delivered
Intelligent bandwidthutilisation in stressednetworks
Full federation of Nationaland NATO networks; NII (Networking & Information Infrastructure)
Service management in multi network environment
58. MAIN THEMES FOR 2009 - 2012 Software Defined Radio
Improved wave forms – e.g. for enhanced HF services
Robust resilient networking
Ad-hoc networking
Auto configurationand self healing of networks
“Open” networking to support coalitionoperations and CIMIC (civil military cooperation).
59. COMMUNICATION SERVICES Technical Challenges
Ability to extend NATO Communications Footprint to cover LoA i.e., mount and sustain operations up to 15K kms from Brussels
Migration to EoIP to provide a common transport mechanism
Migration to ‘Black or Protected’ IP core (removal of Link Encryption) network to facilitate inter alia coalition, GOs NGO and IO exploitation
Software Defined Radios
Waveform Interoperability
Mobile Ad-Hoc Networking
SATCOM on The Move (SoTM)
High Definition VTC & Telepresence capability
60. MAIN COMMS THEMES 2009 - 2012
Creation of Open network to support coalition and non military operations
SATCOM – Ability to meet increase in demand for coverage and Bandwidth
Integration of NATO & Civil SATCOM & 3rd Party SATCOM services.
Deployable CIS – Integration of NRF and DCIS Baseline assets
High Definition VTC and Telepresence technologies
Recognition that greater industrial partnership to provide and manage services is essential
61. C4I(SR) Capabilities
62. NSIP Programme - Highlights Networks Portfolio Comprises Major CPs
Alliance Core Communication Services - CP 0A0104
M€ 255 (M€ 103 CP5A0004)
Maritime Shore-based Command and Control (C2) Surface Communications CP9B3012/5A0006 Rev1
M€ 335
Electronic Information Security Services CP0A0155
M€ 73
Comms. Support for NATO Wide Theatre Missile CP0A1303
M€ 57
Total Cost of Aggregate Network Investment
M€ 720 (Multi-Year Programme)
63. FIXED NETWORK (NGCS) PROGRAMME SCOPE
CP 0A0104 – Alliance Core Communication Services
To provide the fixed static network or core communication services in support of Alliance Command & Control, Consultation and the Non C3 requirements associated with Partner Coalition and Exercise.
Lay the infrastructure foundation for the future NATO Network Enabled Capability – Information Superiority
Create an open network accessible to Non NATO entities while allowing users to exploit all available services including public
Remaining Investment (NC3A HN): 90M€
CP is Programmed – requires update
64. Forecast Over the Next 5 YearsCP0A0104
65. Wireless CommunicationTransmission Services (non SATCOM) PROGRAMME SCOPE
CP 9A0101
Covers the Maritime Strategic Wireless Services, Strategic Connectivity to AWACS as well as BLOS Strategic Anchor Points to Deployable Forces
Encompasses all wireless communication transmission service requirements, other than those provided via SATCOM (covered by CP9A0130), and LOS transmission services required to support the ACCS (covered by CP5A0109)
Future steps will be addressed through Addenda and Revisions of this edition of CP9A0101
Investment (NC3A HN): 26.2M€
CP in approval process
66. MARITIME SURFACE HF COMMS PROGRAMME SCOPE
CP 9A3012/5A0006
Extends the CIS services to the Maritime task Force whether at sea or in Port
Provides the Ship Shore HF Broadcast capability Message Handling and distribution
MATELO & TASMO
In Port (Along Side) Communications supporting full service suite to sixteen vessels per port and two posts per Maritime Nation.
Subsumed into CP 9A0101
Remaining Investment (NC3A HN): 7.2M€
CP is Programmed
67. NATO SATCOM PROGRAMME SCOPE
CP 5A0030 Rationalise Static Ground Segment
Implement Satellite Ground Stations
CP is Programmed
CP 9A0130 Expand Space & Ground Segment to meet MG06 LOA & includes capability to meet Special Purpose Communication requirements.
Commercial Satellite resources will be required to provide additional coverage and bandwidth to meet the LOA demanded by MG 06
CP is to be submitted in 2009
Investment Not Yet Known but in excess of € 100M
68. Ground Segment Evolution Satellite Ground Station (SGS) Implementation
69. Deployable CIS Programme Scope CP 0A0149 Addendum – DCIS Baseline & NRF
Highly deployable C130 Roll-on Roll-off (RoRo)
Secure and Non-secure Voice, Data, and Video
3 Security Domains (MS, NS and NU)
Transmission – SATCOM-based
Communications – NGCS-based
Information Services – Bi-SC AIS Core
New Capabilities
Satellite Broadcast System (SBS)
Small Team DCIS Packages
Training & Maintenance Capabilities
Remaining Investment: ~ € 235M
CP is Programmed
70. CAT 9 Support to Crisis Response Operations Key Projects
ISAF FOC+
KAIA Move North
KAF
Cabling
CIS
Spectrum Management
71. DSA-ACO - Delivering CIS CapabilitytoOperational Theatres
Tim Murphy
CRO Programme Manager
72. Support to Operations
74. CRO POW: Size and Shape ISAF HQ > Pan-theatre solutions
As the theatre matures, the need for pan-theatre system solutions has evolved
iGeoSIT / JOCWatch deployed theatre-wide in 2008
ICC / NIRIS expanding pan-theatre in 2009
Training needs have expanded to the RCs
Single-system solutions > integration efforts
In the past, specific systems were tailored for specific functions
CRO POW systems have been integrated as ‘mission critical’ applications:
iGeoSIT / JOCWatch
JCHAT
Support to Convoy Tracking and Planning
Support to requirements development
NC3A has been requested to support requirements development in theatre, leverage functional area expertise and first-hand ISAF experienceISAF HQ > Pan-theatre solutions
As the theatre matures, the need for pan-theatre system solutions has evolved
iGeoSIT / JOCWatch deployed theatre-wide in 2008
ICC / NIRIS expanding pan-theatre in 2009
Training needs have expanded to the RCs
Single-system solutions > integration efforts
In the past, specific systems were tailored for specific functions
CRO POW systems have been integrated as ‘mission critical’ applications:
iGeoSIT / JOCWatch
JCHAT
Support to Convoy Tracking and Planning
Support to requirements development
NC3A has been requested to support requirements development in theatre, leverage functional area expertise and first-hand ISAF experience
75. Future Focus ISAF
Large physical and CIS infrastructure projects underway
Large scale projects in Kandahar and Kabul International Airport
Requirement growth in Functional Services such as:
Operations (CIED, Force Protection, C2 and Situational Awareness)
Intelligence (Support to analysis, ISR)
Balkans
Focus on outsourcing CIS support in 2008/2009 and beyond (bid solicitation being prepared)
76. Forecast of CIS in support of CRO
77. Summary Sustained growth in delivery of CIS solutions to operational theatres from 1997 to 2008:
Total Authorisations: 619 M€ (88 M€ in 2007; 192 M€ in 2008)
Committed to industry: 482 M€ (48 M€ in 2007; 154 M€ in 2008)
Shift in focus from infrastructure projects to applications for Functional Services
Key to success:
Operational awareness and People
Capability Delivery lines of development
Clear, simple and dynamic procedures
Improved levels of coordination with Supporting Agencies and Industry
Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
78. How to represent this process for Industry ?
80. BOA DURUMU Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
81. BOA DURUMU Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
82. BOA FIRMALARIMIZ Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
83. Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
84. NC3A ILE IS YAPMA DURUMU Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
85. RFQ (BOA) CEVAP DURUMU Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
87. YILLARA GÖRE IHALE DAGILIMI Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
88. YILLARA GÖRE IHALE DAGILIMI Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
89. YILLARA GÖRE IHALE DAGILIMI Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
91. BOA Imzalanmasi.
Imzalanan BOA ürünlerinin gözden geçirilerek güncellenmesi.
Rekabetçi Ortama uygun teklifler sunulmasi,
Bir ihalede kazanan firmanin 3 kati teklif verilmistir.
Bir ihalede kazanan firma ile firmamiz arasinda % 70 fiyat farki olusmustur.
Ihale kosullarinin esnek oldugunun, karsilikli görüsmeler ile ortak noktaya gelinmesinin mümkün oldugunun bilinmesi.
NC3A ihalelerinden haberdar olmak için sürekli MSB ve NC3A ile irtibatta bulunulmasi. Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
92. NC3A’daki kritik personelle irtibat halinde olunmasi, ikili iliskilerin gelistirilmesi.
Onay safhasinda ihaleden haberdar olabilmek için IC’de görev yapan personelle iletisimin gelistirilmesi.
NC3A personelinin güvenini kazanmak için gönderilen ihale ilanlarina mutlaka cevap verilmesi.
NC3A’ya bildirilen iletisim adreslerinin kontrol edilmesi, sahsa bagliliktan çok ortak, herkesin ulasabilecegi adres belirlenmesi.
Ihale teklifi asamasinda soru sormaktan çekinilmemesi. Akla gelen her türlü konunun Ajansa sorulmasi. Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
93. Ihale kaybedilince karamsarliga düsülmemesi, yilmadan kararlilikla devam edilmesi.
Ihale kosullarinin çok iyi incelenmesi, rekabet gücümüzü artirmak için gerekirse firmalarin isbirligi yapmasi. Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.Just for reference, also the figures from last year’s presentation:
Contracts data for 2007 and 2008:
2007 2008
Authorisations €88,000,000 €192,000,000
Committed to Industry €48,000,000 €154,000,000
Nr Contracts awarded 130 136
Comments:
For basically the same amount of co.ntract instances the money value has increased significantly due to higher value projects.
94. CONTACTING NC3A