1 / 9

CLIC structure collaboration meeting

CLIC structure collaboration meeting. G. Riddone, AB-RF 2008.07.04. Agenda . Status of the production and test program (CERN, KEK, SLAC) Testing of PETS (CERN, SLAC) Design of quadrants and disks (KEK) Pulse compressor for Nextef at KEK. Status – x-band ac. structures .

eli
Download Presentation

CLIC structure collaboration meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CLIC structure collaboration meeting G. Riddone, AB-RF 2008.07.04

  2. Agenda • Status of the production and test program (CERN, KEK, SLAC) • Testing of PETS (CERN, SLAC) • Design of quadrants and disks (KEK) • Pulse compressor for Nextef at KEK

  3. Status – x-band ac. structures

  4. CLIC vg1 quadrant damped TD18_vg2.4_quad#3 • For the preparation decision to follow the same procedure as SLAC for the disk version • Done at CERN: dimensional control, Rf check, cleaning, assembly test  shipping to SLAC on 24.06 • To be done at SLAC: heat treatment, brazing of the cooling pipes, SEM, baking, final assembly, rf checks • CERN agreement on additional SLAC costs • Question: Tuning (yes/no)  decision postponed after heat treatment • Heat treatment at CERN done for #1 (same cycle as for SLAC)  then rf check, dimensional control, tuning test

  5. C10 damped structures Cern agreement

  6. CLIC vg1 structures

  7. Status - PETS Received bars for 12 GHz test  Dimensional control: OK (+/- 10 mm)

  8. PETS 11.4 GHz w/o damping mat. • Done at CERN before shipping to SLAC • Dimensional control of two bars • Brazing and preparation of the couplers • Assembly test • Rf check • Cleaning of all pieces • EB welding of the bars • Tank and couplers assembly • Final EB welding: 07.07 • rf test + UHV test PETS shall be shipped to SLAC in CW28 at the latest

  9. 11.4 GHz Loads (x4) for KEK 11.4 GHz Loads (x4) for KEK 2 with KEK flanges and 2 with SLAC flanges • Rf design done • Mechanical design done • Call for tender under way • Fabrication: by end of October • Supply of the material: shipped to CERN, not received yet SLAC flanges: pieces available at CERN, brazing and assembly by end of July

More Related