Contractor EHS Performance Data . April 2013. 2013 YTD OSHA Rates. Freeport Site 0.10 Dow 0.15 Site Contractors 0.19 Site Contractors w/o Gulfstream 0.13. Number of OSHAs. Dow 1 Contractor 3. Observation Participation. Hand Data. Repeaters.
E N D
Contractor EHS Performance Data April 2013
2013 YTD OSHA Rates Freeport Site 0.10 Dow 0.15 Site Contractors 0.19 Site Contractors w/o Gulfstream 0.13 Number of OSHAs Dow 1 Contractor 3
Discussion Points • Job Execution Plan (JEP) Guidance • Gulfstream Incident Management • Foreman Pocket Guide for 2013 is • going to the press and will be available soon – watch for • e-mail for pickup instructions
Debbie Shelton Recognition
Tracer: Unit-5 Site Oxy - Performed heat tracing & insulation activities for the Unit 5 TA for the past 5 yrs without ZERO incidents. • Speciality Tank Services: OC-3 Tank V5 - Crew has been productive while being SAFE. They show positive attitudes & have good working habits. • Miken: B-8400 - Crew completed work during the PCCP outage. The crew was always on the spot and always had a great work attitude and worked Safely. • Safway: B-3900 LEN TA - The group provided quality scaffolds and insulation work and did it Safely. • Miken: A-2501 – Recognize Scaffold crew for working on the A-2501 TA. Their safety first outlook and can do attitude has made a positive impact on the Turnaround. • Brand: B-1900 Throx TA - Crews did an outstanding job on pre-work. SAFETY was always evident on their job sites. • ICS: B-6200 TA - Epoxy Nesters group has great work ethic, provides quality craftsmanship and is determined to work safely. • ICS: B-3900 LEN TA, David (Cowboy) Culp & Orric (Woody)Woodard - Provided quality craftsmanship with the highest priority to SAFETY. Stood out from the rest. To see the full recognitions, please go to www.tocas.org
REMINDERS • April Emphasis & STAC Insert (Walking) • Www.tocas.org • NEXT Safety Contact meeting 5/9/13