1 / 18

John Bare The Arthur M. Blank Family Foundation jbare@ambfo 404.367.2062

10 Things in 10 Minutes on Philanthropy, Evaluation &Social Change Creative Change 2011 August 18, 2011. John Bare The Arthur M. Blank Family Foundation jbare@ambfo.com 404.367.2062. 1. The current evaluation culture is crummy. 1. The current evaluation culture is crummy. 2. I have a….

elsa
Download Presentation

John Bare The Arthur M. Blank Family Foundation jbare@ambfo 404.367.2062

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 10 Things in 10 Minutes on Philanthropy, Evaluation &Social ChangeCreative Change 2011August 18, 2011 John Bare The Arthur M. Blank Family Foundation jbare@ambfo.com 404.367.2062

  2. 1. The current evaluation culture is crummy.

  3. 1. The current evaluation culture is crummy.

  4. 2. I have a…. METRIC?

  5. 2. I have a dream.

  6. 3. Fit the evaluation to the system. Adapted from Getting to Maybe, Westley, Zimmerman, Patton (2006, Random House Canada)

  7. 4. Segment. Segment. Segment. Adapted from HopeLab segmentation report, “To Move Me, First You’ve Got to Understand Me.”

  8. 5. Pay attention to the arrows, not the boxes.

  9. 6. Use tools designed for complex systems. • Leading Indicators • Risk Analysis • Test Assumptions • Triggers for Contingency Plans

  10. 7. Understand positive & negative feedback. • Compare observed vs. expected. • Adjust. • Repeat.

  11. 8. Model social change. Change = Dissatisfaction * Vision * Process or C = D * V * P Adapted from Bob Bontempo, Columbia University Business School

  12. 9. Align evaluation with change stages. Are you helping to create Dissatisfaction?

  13. 9. Align evaluation with change stages.

  14. 9. Align evaluation with change stages. Are you building support for a Vision?

  15. 9. Align evaluation with change stages.

  16. 9. Align evaluation with change stages. Are you implementing a Process?

  17. 9. Align evaluation with change stages.

  18. 10.

More Related