An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1 Sequence of Well drilling Eng. El Sayed Amer

  2. Eng. El Sayed Amer

  3. Page 3 3 Schedule Time frame managing Exploration introduction THE Drilling SITE Drilling Rig Running CSG Casing CMT Basic logging Eng. El Sayed Amer

  4. 4 Eng. El Sayed Amer

  5. 5 Eng. El Sayed Amer

  6. 6 Eng. El Sayed Amer

  7. 7 Exploration and Exploration and Geophysics Geophysics Eng. El Sayed Amer

  8. 8 Eng. El Sayed Amer

  9. 9 Eng. El Sayed Amer

  10. 10 Eng. El Sayed Amer

  11. 11 Seismic survey Eng. El Sayed Amer

  12. 12 Eng. El Sayed Amer

  13. 13 Eng. El Sayed Amer

  14. 14 Eng. El Sayed Amer

  15. 15 Eng. El Sayed Amer

  16. 16 Let the Story Begin Eng. El Sayed Amer

  17. 01 17 THE Drilling SITE Once the location for the site has been established, the area is prepared for drilling, with the following steps: 1. Site Preparation 2.Conductor-rathole-mousehole 3. Transporting Equipment Eng. El Sayed Amer

  18. 01 18 THE Drilling SITE 1. Leveling & site preparation Eng. El Sayed Amer

  19. 01 19 THE Drilling SITE 2. Cellar digging • A dug-out area, • located below the rig. • The cellar serves as a cavity in which the casing spool and casing head reside. Eng. El Sayed Amer

  20. 01 20 THE Drilling SITE 2. Cellar digging Eng. El Sayed Amer

  21. 01 21 THE Drilling SITE 3. Mud pit digging Eng. El Sayed Amer

  22. 01 22 THE Drilling SITE 3. Mud pit digging Eng. El Sayed Amer

  23. 01 23 THE Drilling SITE 4. Conductor pipe hammering Conductor Hole Conductor Hole A large diameter hole bored to facilitate steel pipe. May be cemented in place to allow conventional oil and gas well drilling operations ,and also allows fluid returns to a mud system when drilling surface hole. CONDUCTOR PIPE INSTALLATION 30” OD x 1”. wall thickness has been selected and Affiliate’s standard for world-wide exploration and development drilling activities Pile Hammers • Diesel pile hammers are used for surface driving operations of conductor pipe. • The driving depth of the conductor pipe is a function of the sediments in the ground. • The most common used system is a hammer weight of 18t Eng. El Sayed Amer

  24. 01 24 THE Drilling SITE 4. Conductor pipe hammering Eng. El Sayed Amer

  25. 01 25 THE Drilling SITE 4. Conductor pipe hammering Drive Shoe Technology Eng. El Sayed Amer

  26. 01 26 THE Drilling SITE 5. Rathole drilling Conductor pipe mouth hole Rat Rat- -hole hole Eng. El Sayed Amer

  27. 01 27 THE Drilling SITE 5. Rathole drilling • Rathole Rathole A shallow bored hole under the derrick substructure in which the Kelly temporarily stored during tripping operations. Kelly is • Mouse Hole Mouse Hole A shallow bored hole under the derrick substructure in which a single drill pipe joint pipe joint is temporarily set to facilitate easier connections. . single drill Eng. El Sayed Amer

  28. 01 28 THE Drilling SITE 4. Conductor pipe hammering Eng. El Sayed Amer

  29. 01 29 THE Drilling SITE 4. Conductor pipe hammering Eng. El Sayed Amer

  30. 02 30 Drilling Rig 1. Rig Move Eng. El Sayed Amer

  31. 02 31 Drilling Rig 1. Rig Move Eng. El Sayed Amer

  32. 02 32 Drilling Rig 1. Rig Move Eng. El Sayed Amer

  33. 02 33 Drilling Rig 2. Rig up Eng. El Sayed Amer

  34. 02 34 Drilling Rig 2. Rig up a. Mast Raising Eng. El Sayed Amer

  35. 02 35 Drilling Rig 2. Rig up b. substructure Raising Eng. El Sayed Amer

  36. 02 36 Drilling Rig 2. Rig up Eng. El Sayed Amer

  37. 02 37 Drilling Rig 2. Rig up Eng. El Sayed Amer

  38. 02 38 Drilling Rig 2. Rig up Eng. El Sayed Amer

  39. 02 39 Drilling Rig 3. Conductor connection Shaker line Eng. El Sayed Amer

  40. 02 40 Drilling Rig 4. Rig Acceptance Rig acceptance checklist Rig accept Eng. El Sayed Amer

  41. 02 41 Drilling Rig 5. Pipe rack Eng. El Sayed Amer

  42. 02 42 Drilling Rig 6. Drill Pipe Inspection Eng. El Sayed Amer

  43. 02 43 Drilling Rig 6. Drill Pipe Inspection Thread cleaning Thread cleaning Eng. El Sayed Amer

  44. 02 44 Drilling Rig 6. Drill Pipe Inspection Thread cleaning Thread cleaning Eng. El Sayed Amer

  45. 02 45 Drilling Rig 7. Stands make up Eng. El Sayed Amer

  46. 02 46 Drilling Rig 7. Stands make up • Single pipe • Stand “ 3 singles “ Eng. El Sayed Amer

  47. 02 47 Drilling Rig 7. Stands make up Eng. El Sayed Amer

  48. 02 48 Drilling Rig 7. Stands make up Eng. El Sayed Amer

  49. 02 49 Drilling Rig 8. Rack back stands Eng. El Sayed Amer

  50. 02 50 Drilling Rig 9. BHA preparation Drill pipe Heavyweight BHA BHA Drill Collers • Run a 26" bit + 3 x 9" DC + HW-DP • Run a 26" bit + float valve + 36" Hole Opener + 1 x 9" Monel DC + 1 x 9" Spiral DC + 5" HWDP + 5" DPs Hole Opener Bit sub Drill Bit Eng. El Sayed Amer