An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Insertable B Layer Cooling System Services Jan Godlewski Bart Verlaat J.GodlewskiPH-DT-PO

  2. J.Godlewski PH-DT-PO Power supply Water cooling Compressed air Vacuum IBL flushing

  3. Power supply J.Godlewski PH-DT-PO • Total need of power for IBL cooling station has been estimated to 20 kW • This include: • Chiller compressor • Heaters • Electrical and control system components • We will ask for UPS for IBL cooling system • Statement from Wieslaw Iwanski: • Atlas has enough reserve in existing UPS to feed the 20 kW pump of the IBL cooling system. However, there is no actually possibility to connect such a circuit to existing UPS distribution as all available breakers in UPS switchboards in USA15 are already in use. Atlas will therefore order and install during the LS1 a new switchboard fed from the UPS network in USA15 to address this situation. • It’s assumed that this switchboard will provide a standard monitoring of all breakers i.e. ‘on/off’  and ‘electrical fault’ sensors without possibility to turn on/off breakers by external systems

  4. Nitrogen flushing from gas room in USA15 J.Godlewski PH-DT-PO

  5. IBL nitrogen flushing J.Godlewski PH-DT-PO • IBL will be flushed with nitrogen using existing system in USA15 gas room • PH/DT Gas group will take care about additional equipment and modification in the ID flushing rack • Goal is to reach dew point in IBL volume below -60 C • ATLAS TC will install copper pipe between ID rack in USA15 gas room and IBL volume • 8 mm OD copper pipe

  6. Mixed water for the chiller Water cooled condenser Chiller J.Godlewski PH-DT-PO • Chiller for IBL cooling station will have water cooled condenser • Amount of water is around 20 l/min • Close to proposed cooling unit location there exist piping for primary, mixed and chilled water • Necessary amount of water will be taken from mixed or primary water circuit

  7. Vacuum and compressed air J.Godlewski PH-DT-PO Vacuum pump for vacuum insulated transfer lines will be installed in UX15 on HS level 7. Compressed air for CO2 cooling units will be delivered from evaporative system air compressors situated in USA15 CV room.