ARC Closing Report. Authors:. Date: 2012-07-19. Abstract. This document is the closing report for ARC SC, July 2012, San Diego meeting. Work Completed. 802 Overview and Architecture Draft 1.4 letter ballot Update on status:
E N D
ARC Closing Report Authors: Date: 2012-07-19 Mark Hamilton, Polycom, Inc.
Abstract This document is the closing report for ARC SC, July 2012, San Diego meeting Mark Hamilton, Polycom, Inc.
Work Completed • 802 Overview and Architecture Draft 1.4 letter ballot • Update on status: • Letter Ballot closed July 6, comment resolution this week, all 802.11 technical comments agreed • 802 expects to request Conditional Approval for SB this week • Reviewed “802.11 General Links” presentation (11-12/589r2) • Support forming a Study Group, should work in cooperation with 802.1 (discussed further with 802.1 in joint session) • Held joint meeting with 802.1 • Discussion on 802.11 and bridging – agreement to start Study Group(s) • Discussion on TRILL and 802.11s • 802.1AC (MAC Service Definition) revision • No architectural changes, will leave detailed alignment to REVmc • Minutes are in 11-12/760 Mark Hamilton, Polycom, Inc.
Teleconferences • None expected, if needed, will schedule with 10 days notice Mark Hamilton, Polycom, Inc.
September 2012 Goals • One meeting slot planned: • 802 O&A ballot, as appropriate • 802.1Q corrigenda or revision ballots, as appropriate • 802.11 “general links” and bridging (discuss progress and status of a Study Group) Mark Hamilton, Polycom, Inc.