ANGUS BIOFUELS & SCOTTISH WOODFUEL SUPPLIES LTD. UNIT 1 – ECO PARK CARSEVIEW ROAD FORFAR DD8 3BS OTHER BUSINESS ACTIVITIES CIVIL ENGINEER FOREST OWNER AND HARVESTING BUSINESS PROPERTY DEVELOPER BILL WATSON TEL: 01307 466699 FAX: 01307 462278 E-MAIL:- bill@ballindarg.co.uk.
E N D
ANGUS BIOFUELS&SCOTTISH WOODFUEL SUPPLIES LTD UNIT 1 – ECO PARK CARSEVIEW ROAD FORFAR DD8 3BS OTHER BUSINESS ACTIVITIES CIVIL ENGINEER FOREST OWNER AND HARVESTING BUSINESS PROPERTY DEVELOPER BILL WATSON TEL: 01307 466699 FAX: 01307 462278 E-MAIL:- bill@ballindarg.co.uk
ANGUSBIOFUELS • WOODCHIP PRODUCER • BOILER INSTALLATION • HEAT SUPPLY CONTRACTS – ESCO • FLUE GAS FILTRATION SPECIALISTS
BIOMASS PLANT • SITUATED AT DRAGONHALL FARM, PADANARAM, BY FORFAR • OPENED BY JOHN SWINNEY IN JAN 2008 • PROJECT COSTS: £3.0 MILLION
MAIN CONSIDERATIONS OF SETTING UP PLANT • LOCATION TO TIMBER SUPPLY • LOCATION TO BOILERS • CAPITAL COST • GRANT ASSISTED BY SSBS AND SRDP • QUALITY OF CHIP • MOISTURE CONTENT OF CHIP • SIZE OF CHIP • HANDLING OF WOOD FROM FOREST TO BOILER
WOODCHIP OUTPUT MAXIMUM OUTPUT = 100 TONNES OF DRY CHIP PER DAY I.E. 400,000 kWhrs OF HEAT/DAY TYPICAL HOUSE WILL USE APPROX 100 kWhrs/DAY (WINTER) TYPICAL PRIMARY SCHOOL WILL USE APPROX 5000 kWhrs/DAY (WINTER)
STORAGE OF WOOD & CHIPS • AIR DRYING = 5000 TONNES • AT ROADSIDE = 10,000 TONNES • DRY CHIP = 2000 TONNES
WOOD CHIP DELIVERY SYSTEMS • Bulk Truck 150m3 per delivery • Tipping Trailer 40- 120m3 • Big Hook System 40-60m3 • Blower Trailer 20- 40m3 • Hi Lift Trailer 16m3 • Bulk Bags 2m3 per bag
AIR QUALITY • PART 1V OF THE ENVIRONMENT ACT 1995 – LOCAL AIR QUALITY MANAGEMENT. • PARTICULATE MATTER SHOULD NOT EXCEED AN ANNUAL MEAN OF 18ug/m3 BY 31 DECEMBER 2010. • ENVIRONMENTAL HEALTH ARE RECOMMENDING ABATEMENT TECHNOLOGY. RHI REQUIREMENT
Biomass Boiler Particulate Emissions Data with and without Filter
ESCO • SUPPLY AND INSTALL BOILER (INCLUDING PLANNING & BUILDING WARRANT) Design and Build • MAINTAIN BOILER • CLEAN & DE-ASH BOILER • OFF-SITE MONITORING using BMS • ALL CIVIL, MECHANICAL AND ELECTRICAL WORK • CHARGE RATE PER kWhr THROUGH METER MONITORED ON FLOW AND RETURN PIPES ADVANTAGES FOR CLIENT • HAS LIMITED RISK • DOES NOT NEED TO MONITOR FUEL QUALITY • NOT RESPONSIBLE FOR FUEL EMISSION QUALITY • DOES NOT REQUIRE EXTRA PERSONNEL TO RUN BOILER
RHI Renewable Heat Incentive • Consultation Deadline 26 April 2010 • Government Implementation April 2011 • Payments from 15 July 2009 • Proposed up to 45kw 9.0p/kw hr • Proposed 45kw to 500kw 6.5p/kw hr • Payments by OFGEM 15 years
THANK YOU. • Bill Watson. • E mail : bill@ballindarg.co.uk • Mobile : 07976 820664 • Office :01307 466699