Highway 1 HOV Lane Widening Estimated Project Milestones

Highway 1 HOV Lane Widening Estimated Project Milestones. Public Information Meetings September 20, 26, 27, 2006 Complete Technical Studies Fall 2007

Download Presentation

Highway 1 HOV Lane Widening Estimated Project Milestones

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Highway 1 HOV Lane WideningEstimated Project Milestones • Public Information Meetings September 20, 26, 27, 2006 • Complete Technical Studies Fall 2007 • Public Review of Draft Environmental Document Winter 2007/2008 • Review & Respond to Public Comments Received Spring 2008 • Preferred Alternative Selection Summer 2008 • Publish Final Environmental Document Winter 2009 If funding is secured • Final Design & Specifications /Right of Way Acquisition 2010 - 2012 • Construction 2011 - 2015

More Related