An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 101 HOV Project Community Coalition Alternative October 18, 2012

  2. Caltrans Community

  3. Presentation Outline • Compare - Community Alternative and Caltrans plans for two time periods: • Construction Phase • Final Product

  4. Community Coalition Goals • Minimize time required for construction • Minimize disruption to local roads & regional businesses • Spend the money wisely • Solve the Congestion Problem

  5. Community Alternative Cabrillo/Hot Springs Interchange Caltrans Reconstruction Cabrillo/Hot Springs Interchange

  6. Community Coalition Alternative Sheffield Drive Caltrans ReconstructionSheffield Drive

  7. Construction Phase Comparison

  8. Left Side Ramp Safety • Accident data shows superior safety compared to 5 right hand ramps –Milpas, Garden, Castillo, Carrillo, Mission • Familiarity & virtually exclusive local use keep it safe

  9. Caltrans HOV (Carpool) Lanes • STARTS at the most constrained point • Requires a forced merge and lane elimination in less than ½ mile on a curve going into a narrow underpass

  10. Operational Analysis

  11. Caltrans Reconstruction Cabrillo/Hot Springs Interchange Community Coalition Alternative Cabrillo/Hot Springs Interchange

  12. Unaddressed Safety and Congestion Issues • Olive Mill southbound on ramp short merge • San Ysidro southbound off ramp congestion • San Ysidro/Posilipo southbound on ramp safety

  13. Community Coalition Questions – Does it: • Minimize time required for construction? • Minimize disruption to local roads & regional businesses? • Spend the money wisely? • Solve the congestion problem?

  14. Next Steps • Caltrans plan has significant and unanswered questions – cannot go forward as presented • Request Caltrans include a full analysis of the alternative in a recirculated Draft EIR • If justified, support design exceptions for: • Retention of southbound left side ramps • Relocation of the start of the HOV lane